共 31 条
- [21] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results Stahl und Eisen, 1997, 117 (05): : 45 - 52
- [22] Evolution of Converter Durability in Thyssen Stahl AG's Steel-making Shops after the Introduction of the TBM Process. Technische Berichte - Thyssen, 1984, 16 (02): : 103 - 108
- [23] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results. STAHL UND EISEN, 1997, 117 (05): : 45 - +
- [24] NOZZLE REFRACTORIES FOR SECONDARY SPECIALTY STEEL-MAKING VESSELS JOURNAL OF THE CANADIAN CERAMIC SOCIETY, 1984, 53 : 44 - 50
- [25] NOZZLE REFRACTORIES FOR SECONDARY SPECIALTY STEEL-MAKING VESSELS. Journal of the Canadian Ceramic Society, 1984, 53 : 44 - 50
- [29] CONSTRUCTION OF A NEW PRIMARY AND SECONDARY DUST REMOVING PLANT IN THE STEEL WORKS BEECKERWERTH OF THYSSEN STAHL AG STAHL UND EISEN, 1987, 107 (20): : 937 - 938