INVESTMENT DECISIONS AND LONG-TERM PLANNING UNDER ELECTRICITY SPOT PRICING

被引:29
|
作者
CARAMANIS, M
机构
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1982年 / 101卷 / 12期
关键词
D O I
10.1109/TPAS.1982.317321
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:4640 / 4648
页数:9
相关论文
共 50 条
  • [21] A fuzzy long-term investment planning model for a GenCo in a hybrid electricity market considering climate change impacts
    Sivrikaya, Berna Tektas
    Cebi, Ferhan
    Turan, Hasan Huseyin
    Kasap, Nihat
    Delen, Dursun
    INFORMATION SYSTEMS FRONTIERS, 2017, 19 (05) : 975 - 991
  • [22] Long-Term Planning of Wind Farm Siting in the Electricity Grid
    Xiao, Jingjie
    Hodge, Bri-Mathias S.
    Liu, Andrew L.
    Pekny, Joseph F.
    Reklaitis, Gintaras V.
    21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 1804 - 1808
  • [23] The impact of planning reserve margins in long-term planning models of the electricity sector
    Reimers, Andrew
    Cole, Wesley
    Frew, Bethany
    ENERGY POLICY, 2019, 125 : 1 - 8
  • [24] Investment Decisions on Long-term Assets: Integrating Strategic and Financial Perspectives
    Frezatti, Fabio
    Bido, Diogenes de Souza
    Capuano Da Cruz, Ana Paula
    Girao Barroso, Marcelo Francini
    de Camargo Machado, Maria Jose
    EUROPEAN ACCOUNTING REVIEW, 2013, 22 (02) : 297 - 336
  • [25] Aiding Long-Term Investment Decisions with XGBoost Machine Learning Model
    Zolotareva, Ekaterina
    ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING (ICAISC 2021), PT II, 2021, 12855 : 414 - 427
  • [26] National Long-Term Investment Planning for Energy and Transportation Systems
    McCalley, James
    Ibanez, Eduardo
    Gu, Yang
    Gkritza, Konstantina
    Aliprantis, Dionysios
    Wang, Lizhi
    Somani, Arun
    Brown, Robert
    IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,
  • [27] LONG-TERM INVESTMENT
    NORTHUP, GW
    JOURNAL OF THE AMERICAN OSTEOPATHIC ASSOCIATION, 1978, 78 (03): : 174 - 175
  • [28] LONG-TERM INVESTMENT
    SOLETHER, R
    JOURNAL OF FORESTRY, 1995, 93 (06) : 2 - &
  • [29] Dealing with uncertainties in long term investment planning of electricity distribution systems with distributed generation
    Catrinu, M. D.
    Istad, M.
    Nordgard, D. E.
    ADVANCES IN SAFETY, RELIABILITY AND RISK MANAGEMENT, 2012, : 201 - 207
  • [30] FORWARD CONTRACTS FOR THE OPERATION OF AN ELECTRICITY INDUSTRY UNDER SPOT PRICING
    KAYE, RJ
    OUTHRED, HR
    BANNISTER, CH
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (01) : 46 - 52