共 50 条
- [34] Scheduling with Rejection to Minimize the Total Weighted Completion Time OPERATIONS RESEARCH AND ITS APPLICATIONS, PROCEEDINGS, 2009, 10 : 111 - +
- [35] A Two-Machine Flowshop Scheduling Problem with a Job Precedence Constraint to Minimize the Total Completion Time JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2017, 76 (12): : 761 - 766
- [36] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489
- [39] Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (5-8): : 751 - 760