共 50 条
- [22] SEDIMENT MANAGEMENT WITH SUBMERGED VANES .2. APPLICATIONS - DISCUSSION JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1992, 118 (05): : 827 - 828
- [23] Effects of submerged sheet pile vanes on mobile river beds JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2015, 16 (03): : 182 - 193
- [25] TURBULENT STRUCTURE IN A RIVER BEND - DISCUSSION JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1987, 113 (11): : 1485 - 1488
- [26] Experimental Study on Scour Hole around Submerged Vanes at 180 Degree Flume Bend PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013, : 10398 - 10407
- [27] Bed topography variations in bend by simultaneous installation of submerged vanes and single bridge pier Arabian Journal of Geosciences, 2019, 12
- [29] RIVER-BEND TAKES ONLY 6 YEARS THANKS TO ALTERNATING 4-10S NUCLEAR ENGINEERING INTERNATIONAL, 1986, 31 (384): : 45 - 46
- [30] River Bank Stabilization Utilizing Rock Vanes in Puerto Rico WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2018: HYDRAULICS AND WATERWAYS, WATER DISTRIBUTION SYSTEMS ANALYSIS, AND SMART WATER, 2018, : 272 - 284