A Computational Grid Scheduling Model to Maximize Reliability Using Modified GA

被引:3
|
作者
Raza, Zahid [1 ,2 ]
Vidyarthi, Deo Prakash [1 ,3 ]
机构
[1] Jawaharlal Nehru Univ, Sch Comp & Syst Sci, New Delhi, India
[2] Banasthali Vidyapith Univ, Vanasthali, Rajasthan, India
[3] Banaras Hindu Univ, Dept Comp Sci, Varanasi, Uttar Pradesh, India
关键词
Computational Grid; Elitist Method; Genetic Algorithm; NP Hard Problems; Reliability; Scheduling;
D O I
10.4018/jghpc.2011010101
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper presents a grid scheduling model to schedule a job on the grid with the objective of ensuring maximum reliability to the job under the current grid state. The model schedules a modular job to those resources that suit the job requirements in terms of resources while offering the most reliable environment. The reliability estimates depict true grid picture and considers the contribution of the computational resources, network links and the application awaiting allocation. The scheduling executes the interactive jobs while considering the looping structure. As scheduling on the grid is an NP hard problem, soft computing tools are often applied. This paper applies Modified Genetic Algorithm (MGA), which is an elitist selection method based on the two threshold values, to improve the solution. The MGA works on the basis of partitioning the current population in three categories: the fittest chromosomes, average fit chromosomes and the ones with worst fitness. The worst are dropped, while the fittest chromosomes of the current generation are mated with the average fit chromosomes of the previous generation to produce off-spring. The simulation results are compared with other similar grid scheduling models to study the performance of the proposed model under various grid conditions.
引用
收藏
页码:1 / 20
页数:20
相关论文
共 50 条
  • [21] Adaptation of Smard Grid Technologies The use of Computational Intelligence for reliability estimation and maintenance scheduling
    Malakhov, Andrew
    Kopyriulin, Petr
    Petrovski, Sergey
    Petrovski, Andrei
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2012,
  • [22] EACS Approach for Grid Workflow Scheduling in a Computational Grid
    Kumar, E. Saravana
    Sumathi, A.
    [J]. COMPUTATIONAL INTELLIGENCE AND INFORMATION TECHNOLOGY, 2011, 250 : 276 - +
  • [23] An Adaptive Scheduling Algorithm for Scheduling Tasks in Computational Grid
    Yu, Kun-Ming
    Chen, Cheng-Kwan
    [J]. GCC 2008: SEVENTH INTERNATIONAL CONFERENCE ON GRID AND COOPERATIVE COMPUTING, PROCEEDINGS, 2008, : 185 - 189
  • [24] Optimization of Workload Scheduling in Computational Grid
    Goswami, Sukalyan
    Das, Ajanta
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON FRONTIERS IN INTELLIGENT COMPUTING: THEORY AND APPLICATIONS, FICTA 2016, VOL 1, 2017, 515 : 417 - 424
  • [25] NETWORK SCHEDULING FOR COMPUTATIONAL GRID ENVIRONMENTS
    Swany, Martin
    Wolski, Rich
    [J]. SCALABLE COMPUTING-PRACTICE AND EXPERIENCE, 2005, 6 (03): : 85 - 94
  • [26] Intermediate Mode Scheduling in Computational Grid
    Panda, Sanjaya Kumar
    Agrawal, Pratik
    Mohapatra, Durga Prasad
    [J]. 2014 INTERNATIONAL CONFERENCE ON GREEN COMPUTING COMMUNICATION AND ELECTRICAL ENGINEERING (ICGCCEE), 2014,
  • [27] A study on task scheduling in computational Grid
    Fang, X
    Wang, XG
    Li, SL
    He, C
    [J]. PROCEEDINGS OF THE 6TH JOINT CONFERENCE ON INFORMATION SCIENCES, 2002, : 215 - 219
  • [28] A Survey on Reliability Scheduling on Grid Computing
    Raj, Joshua Samuel
    Rachel, I. Stephie
    [J]. 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS AND CONTROL (ISCO 2013), 2013, : 331 - 334
  • [29] MDP based link scheduling in wireless networks to maximize the reliability
    Jun Xu
    Jianfeng Yang
    Yinbo Xie
    Chengcheng Guo
    Yinbo Yu
    [J]. Wireless Networks, 2016, 22 : 1659 - 1671
  • [30] Dynamic Separation of Microgrid System to Maximize Reliability in a Smart Grid
    Zhu, Xuefei
    Kim, Jinho
    Muljadi, Eduard
    Nelms, R. Mark
    [J]. 2021 13TH ANNUAL IEEE GREEN TECHNOLOGIES CONFERENCE GREENTECH 2021, 2021, : 232 - 236