共 46 条
- [41] DEVELOPMENT OF TECHNOLOGY ON CONNECTION PICKLING LINE WITH COLD TANDEM MILLS .1. CONSTRUCTION AND OPERATION OF NO-2 PICKLING LINE AND NO-1 COLD TANDEM FULLY CONTINUOUS MILLS AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORPORATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S367 - S367
- [42] DEVELOPMENT OF A MULTIPURPOSE CONTINUOUS ANNEALING LINE FOR COLD-ROLLED SHEET STEEL [J]. IRON AND STEEL ENGINEER, 1983, 60 (05): : 36 - 44
- [43] CONVERSION TO COMBINED BLOWING SYSTEM WITH WIDE-RANGE OF FLOW-RATE .2. CONTROL-SYSTEM FOR COMBINED TOP-BLOWN AND BOTTOM-BLOWN CONVERTER OF NO-1 STEELMAKING PLANT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S177 - S177
- [44] DEVELOPMENT OF CONTINUOUS ANNEALING PROCESS FOR THIN COLD-ROLLED STRIP .2. CONSTRUCTION AND OPERATION OF YAWATA NO 2 CONTINUOUS ANNEALING AND PROCESSING LINE, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1058 - 1058
- [46] CONSTRUCTION OF FULLY CONTINUOUS COLD-ROLLING MILL FOR ULTRA-THIN GAUGE STEEL STRIP .1. ACCURACY OF SET-UP MODEL IN 6T-CM OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1158 - 1158