MEASURING THE IMPACT OF A DELAY BUFFER ON QUALITY COSTS WITH AN UNRELIABLE PRODUCTION PROCESS

被引:7
|
作者
MOINZADEH, K
KLASTORIN, TD
机构
关键词
QUALITY MANAGEMENT; SAMPLING INSPECTION POLICIES; UNRELIABLE PRODUCTION PROCESSES; DELAY BUFFER;
D O I
10.1287/mnsc.41.3.513
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider an unreliable production process which produces nondefective items when operating in control, but produces defective items with a probability oc when the process has shifted to an out-of-control state. Following a JIT philosophy, we stop the entire line and repair the machine as soon as we detect that the process has shifted to an out-of-control state. To test whether a process shift has occurred, we inspect the last m units for every n units produced and stop the machine if a defective unit is found. More important, we place a ''delay buffer'' immediately after the unreliable process, which serves to delay the movement of items from the unreliable machine to other processes (or customers) downstream in the production system. When we detect that the machine has shifted to an out-of-control state, we stop the entire line and examine all previously uninspected items in the delay buffer; in this way, the buffer serves to reduce the expected rework and penalty (e.g., warranty) costs downstream when a process shift has occurred. In this paper, we develop a model for this approach and use this model to test the operating characteristics of our system. Computational results illustrate our hypothesis that a delay buffer may significantly reduce expected total costs of a quality control process.
引用
收藏
页码:513 / 523
页数:11
相关论文
共 50 条
  • [31] Simultaneous allocation of buffer capacities and service times in unreliable production lines
    Kassoul, Khelil
    Cheikhrouhou, Naoufel
    Zufferey, Nicolas
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (03) : 644 - 664
  • [32] A scale transformation algorithm for buffer allocation in production lines with unreliable machines
    Li, Lei
    Luo, Xu
    Zhang, Shi-Gang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2025, 201
  • [33] A tabu search approach for buffer allocation in production lines with unreliable machines
    Demir, Leyla
    Tunali, Semra
    Lokketangen, Arne
    ENGINEERING OPTIMIZATION, 2011, 43 (02) : 213 - 231
  • [34] The impact of the production process on the quality of strawberry jam
    Bienczak, Agata
    Markowska, Joanna
    Polak, Elzbieta
    Bienczak, Krzysztof
    Sydow, Zuzanna
    Rak-Urbaniak, Liliana
    PRZEMYSL CHEMICZNY, 2018, 97 (05): : 668 - 671
  • [35] The potential impact of measuring healthcare quality on pharmaceutical-related costs and outcomes
    Roper, WL
    Hodlewsky, RT
    Tilson, H
    Lohr, KN
    Campbell, WH
    DISEASE MANAGEMENT & HEALTH OUTCOMES, 2002, 10 (04) : 233 - 239
  • [36] Optimization and Adjustment of Production Process Parameters in Order to Reduce Production Costs and Increase Quality
    Zhang, Xu-Wei
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2021, 20 (04): : 621 - 628
  • [37] An Adaptive Gradient Algorithm for Solving the Buffer Allocation Problem in Unreliable Production Lines
    Li, Lei
    Chen, Mengqiao
    APPLIED SCIENCES-BASEL, 2025, 15 (03):
  • [39] Buffer allocation, equipment selection and line balancing optimisation in unreliable production lines
    Nahas, Nabil
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2020, 14 (02) : 217 - 246
  • [40] On Local Optima Distribution in Buffer Allocation Problem for Production Line with Unreliable Machines
    Dolgui, Alexandre
    Eremeev, Anton
    Sigaev, Viatcheslav
    IFAC PAPERSONLINE, 2022, 55 (10): : 1092 - 1097