共 50 条
- [2] Sequencing of an M machine flow shop with setup, processing and removal times separated PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 321 - 325
- [3] Sequencing of an M machine flow shop with setup, processing and removal times separated The International Journal of Advanced Manufacturing Technology, 2006, 30 : 286 - 296
- [4] Sequencing of an M machine flow shop with setup, processing and removal times separated INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (3-4): : 286 - 296
- [8] Admissible search methods for minimum penalty sequencing of jobs with setup times on one and two machines 1600, Morgan Kaufmann Publ Inc, San Mateo, CA, USA (01):
- [9] VARIATION OF N JOBS 2 MACHINES SEQUENCING PROBLEM JOURNAL OF SYSTEMS MANAGEMENT, 1974, 25 (09): : 43 - 44
- [10] HEURISTIC-ALGORITHM FOR N-JOBS, M-MACHINES STATIC FLOWSHOP SCHEDULING-PROBLEMS, TAKING SETUP, PROCESSING AND REMOVAL TIMES INTO ACCOUNT RAIRO-AUTOMATIQUE-PRODUCTIQUE INFORMATIQUE INDUSTRIELLE-AUTOMATIC CONTROL PRODUCTION SYSTEMS, 1988, 22 (05): : 453 - 470