共 8 条
- [2] MONITORING OF GASIFICATION IN BLAST FURNACE-A AT THE STAHLWERKE-PEINE-SALZGITTER-AG STAHL UND EISEN, 1984, 104 (22): : A12 - A12
- [3] REVAMPING OF THE COLD WIDE STRIP MILL OF STAHLWERKE-PEINE-SALZGITTER-AG STAHL UND EISEN, 1988, 108 (06): : 267 - 273
- [4] NEW OXYGEN STEEL PLANT IN SALZGITTER WORKS OF STAHLWERKE PEINE-SALZGITTER AG STAHL UND EISEN, 1970, 90 (26): : 1496 - &
- [5] PRODUCTION OF HEAVY STEEL SECTIONS FROM SLIT CONTINUOUSLY CAST SLABS IN THE STAHLWERKE-PEINE-SALZGITTER-AG STAHL UND EISEN, 1991, 111 (05): : 93 - 99
- [6] OPERATIONAL AND TEST-RESULTS FROM A PILOT-PLANT FOR THE COMBINING OF THE DRY COOLING OF COKE AND THE PREHEATING OF COAL AT STAHLWERKE-PEINE-SALZGITTER-AG STAHL UND EISEN, 1984, 104 (22): : 1123 - 1127
- [7] CONTINUOUS SLAB CASTING PLANT OF KLOCKNER-WERKE-AG, WORKS BREMEN - DESCRIPTION OF PLANT AND OPERATING RESULTS STAHL UND EISEN, 1977, 97 (24): : 1213 - 1219
- [8] CONTINUOUS SLAB CASTING PLANT OF AUGUST THYSSEN-HUTTE IN BOP STEELWORKS BEECKERWERTH-DESCRIPTION OF PLANT AND OPERATING RESULTS OF 1ST 2 YEARS STAHL UND EISEN, 1977, 97 (01): : 17 - 22