共 50 条
- [3] FURTHER MODERNIZATION OF THE COLD WIDE STRIP MILL AT STAHLWERKE PEINE-SALZGITTER AG. [J]. MPT. Metallurgical plant and technology, 1988, 11 (02):
- [4] Further Modernization of the Cold Wide Strip Mill of Stahlwerke Peine-Salzgitter AG. [J]. Stahl und Eisen, 1988, 108 (06): : 73 - 79
- [5] PLANNING AND START-UP OF A NEW UNIVERSAL BEAM ROLLING-MILL OF STAHLWERKE PEINE-SALZGITTER AG [J]. STAHL UND EISEN, 1977, 97 (16): : 766 - 774
- [6] CONTINUOUS SLAB CASTING PLANT WITH SHORT DUMMY BAR OF STAHLWERKE-PEINE-SALZGITTER-AG, SALZGITTER - TECHNICAL CONCEPT AND OPERATING RESULTS [J]. STAHL UND EISEN, 1975, 95 (21): : 982 - 987
- [7] MONITORING OF GASIFICATION IN BLAST FURNACE-A AT THE STAHLWERKE-PEINE-SALZGITTER-AG [J]. STAHL UND EISEN, 1984, 104 (22): : A12 - A12
- [8] REVAMPING OF THE COLD WIDE STRIP MILL OF STAHLWERKE-PEINE-SALZGITTER-AG [J]. STAHL UND EISEN, 1988, 108 (06): : 267 - 273
- [9] PRODUCTION OF HEAVY STEEL SECTIONS FROM SLIT CONTINUOUSLY CAST SLABS IN THE STAHLWERKE-PEINE-SALZGITTER-AG [J]. STAHL UND EISEN, 1991, 111 (05): : 93 - 99
- [10] STAHLWERKE-PEINE-SALZGITTER LD PROCESS WITH THE USE OF DOLOMITE [J]. STAHL UND EISEN, 1984, 104 (02): : 82 - 82