共 50 条
- [22] Cut-to-register sheeting trims time and labor costs 2001, Primedia Intertec Publishing Corp. (75):
- [24] HOW TUNNEL FORMS CUT LABOR AND MATERIAL COSTS. Engineering and Contract Record, 1974, 87 (06): : 40 - 42
- [25] FINDING NEW WAYS TO RAISE SPEEDS AND CUT COSTS IN RIGID PACKAGING MODERN PLASTICS, 1978, 55 (08): : 40 - 43