共 50 条
- [21] SINGLE PASS INSPECTION FOR STEAM-GENERATOR TUBES [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1991, 36 (444): : 26 - 28
- [22] EDDY-CURRENT EXAMINATION OF BEZNAU STEAM-GENERATOR TUBING [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 20 (APR21): : 196 - 200
- [23] FRACTURE TESTING OF EBR-II STEAM-GENERATOR TUBING [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 38 (JUN): : 321 - 322
- [25] LICENSING ASPECTS OF STEAM-GENERATOR REPAIR PROGRAMS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 39 : 826 - 826
- [26] REMOTELY CONTROLLED PLATFORM FOR INSPECTION OF STEAM-GENERATOR TUBES [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 22 (NOV16): : 542 - 543
- [28] TURKEY POINT STEAM-GENERATOR REPAIR PROGRAM [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 39 : 825 - 825
- [29] GIBBON GETS TO GRIPS WITH SOVIET STEAM-GENERATOR INSPECTION [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1990, 35 (436): : 39 - 40
- [30] STEAM-GENERATOR POLAR CRANE MAINTENANCE AND INSPECTION SYSTEM [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 30 (NOV): : 794 - 795