INVESTIGATION AND ESTIMATION OF RELIABILITY OF REHEAT LINE, 980 BY 40 MM IN DIAMETER, OF 800 MW UNIT AT SLAVYANSK CENTRAL POWER-STATION

被引:0
|
作者
MAZEL, RE [1 ]
LAPPA, VA [1 ]
TALYSHEVA, II [1 ]
机构
[1] ALL UNION HEAT ENGN INST,MOSCOW,USSR
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:15 / 19
页数:5
相关论文
共 13 条
  • [11] STARTING METHODS FOR GAS-FIRED AND OIL-FIRED BOILER-TURBINE UNITS 800 MW IN CAPACITY AT UGLEGORSK CENTRAL POWER-STATION
    AVRUTSKII, GD
    DOVERMAN, GI
    OSTROVETSKII, RM
    PLOTKIN, ER
    SHMUKLER, BI
    GOMBOLEVSKII, VI
    GONOBOBLEV, AS
    KRASANTSOV, VN
    MATUSHEVSKII, EV
    NAKHIMOV, VI
    SKOPYLATOV, VM
    TUPIKIN, AA
    THERMAL ENGINEERING, 1981, 28 (09) : 527 - 530
  • [12] RESULTS OF AN INVESTIGATION INTO START-UP AND SHUT-DOWN OPERATION OF CENTRAL POWER-STATION UNIT STEAM-GENERATORS IN BULGARIA
    SPASSOW, B
    ENERGIETECHNIK, 1977, 27 (09): : 347 - 353
  • [13] FULL-SCALE TESTING OF THE LENINGRAD METAL WORKING PLANT 1200 KTSS-1 CONDENSER OF THE 1200-MW POWER-GENERATING UNIT AT KOSTROMA CENTRAL POWER-STATION
    IVANOV, AV
    KOPYLOV, NF
    THERMAL ENGINEERING, 1986, 33 (12) : 657 - 660