l Comprehensive system analysis of a multipurpose run-of-river power plant with holistic qualitative assessment

被引:10
|
作者
Heller, Philippe [1 ]
Bollaert, Erik F. R. [2 ]
Schleiss, Anton J. [2 ]
机构
[1] Edric Ch Eau Energie Environm Ing Conseils Sarl, Le Grand Chemin 73, CH-1066 Epalinges, Switzerland
[2] Ecole Polytech Fed Lausanne, Lab Construct Hydraul, CH-1015 Lausanne, Switzerland
关键词
Multipurpose run-of-river scheme; complex system analysis; qualitative assessment; network thinking approach; hydropeaking; flood routing; shallow reservoir;
D O I
10.1080/15715124.2010.517672
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Alpine rivers have been channelized by significant river training works in the past two centuries and are now disconnected from their natural environment. In addition, their flow regime is often affected by hydropower plant operation. Also the risk of flood damages is increasing continuously due to urbanization requiring additional flood protection measures. Nevertheless, such trained rivers still have high potential for renewable energy production. Furthermore, there is often a need for biotope restoration and creation of leisure infrastructures. New hydraulic schemes on such rivers have a chance to obtain public acceptance only if they are designed as multipurpose projects, which can alone ensure high synergies between different goals. Multipurpose projects are complex systems and have to be assessed with an appropriate global approach. Based on a network thinking approach, this article presents a global qualitative system analysis specially adapted for a typical multipurpose run-of-river power plant for the six project themes involved: (1) hydraulic scheme and river flow regime, (2) energy, (3) economy, (4) leisure activities, (5) groundwater and (6) ecology. The qualitative network thinking method developed by Gomez and Probst for business strategies is, for the first time, applied and enhanced for the assessment of such a multipurpose hydraulic scheme. Each theme, i.e. purpose of the project, is analysed separately, followed by a comprehensive study of the six themes combined together. Based on a network representation of the global system, three groups of factors are distinguished describing the sizes, the operations and the goals of the project. The size factors characterize the main geometrical aspects of the hydraulic structures, which can define the best layout of the project. The operation factors allow the optimization of the management of the reservoir. Finally, the objective factors characterize the synergies obtained by the multipurpose project. The developed methodology is illustrated with a case study of a multipurpose hydroelectric run-of-river power plant.
引用
收藏
页码:295 / 304
页数:10
相关论文
共 33 条
  • [1] On the control of riverbed incision induced by run-of-river power plant
    Bizzi, Simone
    Dinh, Quang
    Bernardi, Dario
    Denaro, Simona
    Schippa, Leonardo
    Soncini-Sessa, Rodolfo
    WATER RESOURCES RESEARCH, 2015, 51 (07) : 5023 - 5040
  • [2] LIFETIME EVALUATION OF THE MECHANICAL ELEMENTS FOR A RUN-OF-RIVER HYDROELECTRIC POWER PLANT
    Piraianu, Vlad Florin
    Dragoi, Constantin
    Vasilescu, Anca
    Vuta, Liana Ioana
    Dumitran, Gabriela Elena
    ENERGY AND CLEAN TECHNOLOGIES CONFERENCE PROCEEDINGS, SGEM 2016, VOL I, 2016, : 473 - 480
  • [3] Regional Power System Black Start with Run-of-River Hydropower Plant and Battery Energy Storage
    Yan, Weihang
    Gevorgian, Vahan
    Koralewicz, Przemyslaw
    Alam, S. M. Shafiul
    Mendiola, Emanuel
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2024, 12 (05) : 1596 - 1604
  • [4] Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage
    Weihang Yan
    Vahan Gevorgian
    Przemyslaw Koralewicz
    S M Shafiul Alam
    Emanuel Mendiola
    Journal of Modern Power Systems and Clean Energy, 2024, 12 (05) : 1596 - 1604
  • [5] Multipurpose run-of-river hydroelectric power plants: hydropeaking mitigation and consequences on ecological, energetic and social objectives
    Heller, Philippe
    Schleiss, Anton
    HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2011, (06): : 34 - 41
  • [6] Run-of-river Power Plant Sohlstufe Lehen - Hydropower within Urban Areas
    Pfisterer, Martin
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 65 - 70
  • [7] Power Regulation and Fault Diagnostics of a Three-Pond Run-of-River Hydropower Plant
    Saeed, Ahmad
    Khan, Adnan Umar
    Iqbal, Muhammad
    Albogamy, Fahad R.
    Murawwat, Sadia
    Shahzad, Ebrahim
    Waseem, Athar
    Hafeez, Ghulam
    PROCESSES, 2022, 10 (02)
  • [8] Feasibility of the sizes of water-conveyance system in run-of-river power plants
    Balzannikov, Mikhail
    RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117
  • [9] Water Flow Patterns Generation Model for Grid Connected Run-of-River Hydro Power Plant
    Afzaal, Muhammad Umar
    Khan, Muhammad Hammad
    Elahi, Arshad
    2022 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2022 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2022,
  • [10] Exploratory analyses for the assessment of climate change impacts on the energy production in an Amazon run-of-river hydropower plant
    Mohor, Guilherme Samprogna
    Rodriguez, Daniel Andres
    Tomasella, Javier
    Siqueira Junior, Jose Lazaro
    JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2015, 4 : 41 - 59