Power Regulation and Fault Diagnostics of a Three-Pond Run-of-River Hydropower Plant

被引:1
|
作者
Saeed, Ahmad [1 ]
Khan, Adnan Umar [1 ]
Iqbal, Muhammad [1 ,2 ]
Albogamy, Fahad R. [3 ]
Murawwat, Sadia [4 ]
Shahzad, Ebrahim [1 ]
Waseem, Athar [1 ]
Hafeez, Ghulam [5 ]
机构
[1] Int Islamic Univ, Dept Elect Engn, Islamabad 44000, Pakistan
[2] Univ Cyprus, Dept Elect & Comp Engn, KIOS Res & Innovat Ctr Excellence, CY-1678 Nicosia, Cyprus
[3] Taif Univ, Comp Sci Program, Turabah Univ Coll, POB 11099, Taif 21944, Saudi Arabia
[4] Lahore Coll Women Univ, Dept Elect Engn, Lahore 51000, Pakistan
[5] Univ Engn & Technol, Dept Elect Engn, Mardan 23200, Pakistan
关键词
fault diagnostics; model-based fault detection; fault tolerance; fuzzy control;
D O I
10.3390/pr10020392
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Hydropower generation is one of the most prominent renewable sources of power. Run-of-river hydropower is like traditional hydropower but has significantly less environmental impact. Faults in industrial processes are a cause for large amounts of losses in monetary value and off times in industrial processes and consumer utilities. It is more efficient for the system to identify the occurring faults and, if possible, to have the processes running without interruption with the occurrence of a fault. This work uses a model previously proposed-the three-pond hydraulic run-of-river system and integrates it with a turbine and regulated power generation. After integration of the hydraulic system with the turbine and power generation, we then design a diagnostic system for commonly occurring faults within the system. Mathematical models of the faults are formulated and residues are calculated. Fault detection and identification is achieved by analyzing the residues and then a fault-tolerant control is proposed. The Fault Diagnostic Module can correctly detect the faults present and offers sufficient fault compensation to make the system run nearly normally in the event of fault occurrence. With the emergence of distributed power generation smart grids and renewable energy, this fault diagnostic is able to reliably offer uninterrupted power to the grid and thus to consumers.
引用
收藏
页数:39
相关论文
共 50 条
  • [1] Three-Pond Model with Fuzzy Inference System-Based Water Level Regulation Scheme for Run-of-River Hydropower Plant
    Saeed, Ahmad
    Shahzad, Ebrahim
    Khan, Adnan Umar
    Waseem, Athar
    Iqbal, Muhammad
    Ullah, Kaleem
    Aslam, Sheraz
    ENERGIES, 2023, 16 (06)
  • [2] Optimal sizing of a run-of-river small hydropower plant
    Anagnostopoulos, John S.
    Papantonis, Dimitris E.
    ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (10) : 2663 - 2670
  • [3] Run-of-river Power Plant Sohlstufe Lehen - Hydropower within Urban Areas
    Pfisterer, Martin
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 65 - 70
  • [4] Enhanced Operational Flexibility of a Small Run-of-River Hydropower Plant
    Decaix, Jean
    Gaspoz, Anthony
    Hasmatuchi, Vlad
    Dreyer, Matthieu
    Nicolet, Christophe
    Crettenand, Steve
    Muench-Alligne, Cecile
    WATER, 2021, 13 (14)
  • [5] Research on flow in water intake of a run-of-river hydropower plant
    Balzannikov, Mikhail
    RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117
  • [6] Regional Power System Black Start with Run-of-River Hydropower Plant and Battery Energy Storage
    Yan, Weihang
    Gevorgian, Vahan
    Koralewicz, Przemyslaw
    Alam, S. M. Shafiul
    Mendiola, Emanuel
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2024, 12 (05) : 1596 - 1604
  • [7] Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage
    Weihang Yan
    Vahan Gevorgian
    Przemyslaw Koralewicz
    S M Shafiul Alam
    Emanuel Mendiola
    Journal of Modern Power Systems and Clean Energy, 2024, 12 (05) : 1596 - 1604
  • [8] Optimum use of run-of-river hydropower schemes
    Anon
    International Journal on Hydropower and Dams, 1999, 6 (06): : 86 - 89
  • [9] Optimization of Run-of-River Hydropower Plant Design under Climate Change Conditions
    Parisa Sarzaeim
    Omid Bozorg-Haddad
    Babak Zolghadr-Asli
    Elahe Fallah-Mehdipour
    Hugo A. Loáiciga
    Water Resources Management, 2018, 32 : 3919 - 3934
  • [10] Optimization of Run-of-River Hydropower Plant Design under Climate Change Conditions
    Sarzaeim, Parisa
    Bozorg-Haddad, Omid
    Zolghadr-Asli, Babak
    Fallah-Mehdipour, Elahe
    Loaiciga, Liugo A.
    WATER RESOURCES MANAGEMENT, 2018, 32 (12) : 3919 - 3934