共 50 条
- [42] RESULTS OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC IN 1982 ATOMWIRTSCHAFT-ATOMTECHNIK, 1983, 28 (12): : 649 - 653
- [43] ADVANCED CONTROL-SYSTEM SIMPLIFIES PRETREATMENT PLANT-OPERATION WATER-ENGINEERING & MANAGEMENT, 1987, 134 (06): : 36 - 38
- [44] PROHIBITION OF PLANT-OPERATION DUE TO LACK OF ENVIRONMENTAL RELIABILITY OF THE OWNER STAUB REINHALTUNG DER LUFT, 1986, 46 (01): : 36 - 37
- [45] RESULTS OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC IN 1981 ATOMWIRTSCHAFT-ATOMTECHNIK, 1982, 27 (12): : 649 - 654
- [46] RESULTS 1980 OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC ATOMWIRTSCHAFT-ATOMTECHNIK, 1981, 26 (12): : 671 - 676
- [48] CHARACTERIZATION OF OPERATOR ERRORS FROM ACTUAL PLANT-OPERATION EXPERIENCE TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 33 (NOV): : 562 - 564
- [49] OPTIMIZATION OF GAS-ADSORPTION DRYING PLANT-OPERATION CONDITIONS KHIMICHESKAYA PROMYSHLENNOST, 1984, (02): : 113 - 115