共 50 条
- [41] 10-YEAR REVIEW OF UNIT-1 OF THE TIHANGE NUCLEAR-POWER PLANT FIRE PROTECTION AND FIRE FIGHTING IN NUCLEAR INSTALLATIONS, 1989, : 67 - 74
- [42] EVALUATION AND DESIGN OF A CONCENTRATOR FOR A 10 MWE SOLAR POWER-PLANT REVUE DE PHYSIQUE APPLIQUEE, 1978, 13 (03): : 135 - 144
- [43] CONSTRUCTION-INDUSTRY AT A GLANCE + 10-YEAR DECLINE ARCHITECTS JOURNAL, 1976, 164 (36): : 438 - 438
- [46] Predictors of the 10-year direct costs for treating multiple sclerosis ACTA NEUROLOGICA SCANDINAVICA, 2017, 135 (05): : 522 - 528
- [47] CONSTRUCTION AND PLANNED OPERATION OF A HYBRID CYCLE POWER-PLANT ON A GEOPRESSURED WELL GEYSERS - THREE DECADES OF ACHIEVEMENT : A WINDOW ON THE FUTURE, 1989, 13 : 565 - 567
- [48] THE SITUATION OF THE REFLECTIONS ABOUT FORMING OF THE STRATEGY OF POWER-PLANT CONSTRUCTION IN HUNGARY ENERGIA ES ATOMTECHNIKA, 1991, 44 (02): : 63 - 66
- [49] STATISTICALLY BASED QUALITY METHODS FOR POWER-PLANT DESIGN, CONSTRUCTION, AND OPERATION TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 46 : 71 - 71