共 47 条
- [21] Startup of the revamped No.2 continuous annealing line of Kawasaki Steel at Chiba [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2001, 98 (04): : 391 - 398
- [22] THE MODERNIZATION OF LD CONVERTERS AT MIZUSHIMA WORKS, KAWASAKI STEEL CORP .2. NEW INSTRUMENTATION SYSTEM OF K-BOP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (12): : S894 - S894
- [23] DEVELOPMENT OF A MULTIPURPOSE CONTINUOUS ANNEALING LINE FOR COLD-ROLLED SHEET STEEL [J]. IRON AND STEEL ENGINEER, 1983, 60 (05): : 36 - 44
- [24] DEVELOPMENT OF TECHNOLOGY ON CONNECTION PICKLING LINE WITH COLD TANDEM MILLS .1. CONSTRUCTION AND OPERATION OF NO-2 PICKLING LINE AND NO-1 COLD TANDEM FULLY CONTINUOUS MILLS AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORPORATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S367 - S367
- [25] CONTINUOUS MEASUREMENT OF THE STRIP ROUGHNESS AT THE EXIT OF THE CONTINUOUS ANNEALING LINE IN SAINTE-AGATHE WORKS [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1994, 91 (04): : 569 - 574
- [26] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .3. IMPROVEMENT OF TUNDISH SERVICE YARD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S155 - S155
- [27] RECENT DEVELOPMENT IN CONTINUOUS ANNEALING AND PROCESSING LINE FOR COLD-ROLLED STEEL SHEETS [J]. IRON AND STEEL ENGINEER, 1984, 61 (04): : 78 - 79
- [28] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. IMPROVEMENT OF OPERATIONAL CONDITIONS AND QUALITY OF PRODUCTS [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S153 - S153