共 50 条
- [21] EXPERIENCE IN INTERNAL OVERBURDEN DISPOSAL AT PYATIKHATKI OPEN-PIT MINE [J]. REFRACTORIES, 1984, 25 (11-1): : 644 - 646
- [22] COMPUTERIZED OPTIMUM OPEN-PIT DESIGN SYSTEM [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (683): : 207 - &
- [23] IN-PIT CRUSHING - STILL GAINING GROUND IN OPEN-PIT MINES [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 1987, 188 (06): : 76 - 80
- [24] Cut slope reinforcement technique in open-pit mines [J]. JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2004, 11 (04): : 289 - 292
- [25] ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES [J]. CIM BULLETIN, 1993, 86 (973): : 43 - 49
- [27] Tracking Production Volumes of Open-Pit Mines with Photogrammetry [J]. UKSIM-AMSS 11TH EUROPEAN MODELLING SYMPOSIUM ON COMPUTER MODELLING AND SIMULATION (EMS 2017), 2017, : 100 - 106
- [28] Charging for the waste dumping of open-pit metal mines [J]. JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2006, 13 (06): : 481 - 485
- [29] Optimization on Stripping Plan of Outsourced Open-Pit Mines [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2018, 39 (01): : 123 - 127