共 50 条
- [41] CONSIDERATIONS IN DESIGN OF METERING PUMP SYSTEMS CHEMICAL ENGINEERING WORLD, 1995, 30 (05): : 87 - 91
- [42] WORKS TRIAL OF A METERING PUMP - REPLY JOURNAL OF THE IRON AND STEEL INSTITUTE, 1952, 170 (02): : 146 - 147
- [43] FUEL METERING PUMP DEVELOPMENT AND MODELING ICINCO 2011: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1, 2011, : 419 - 426
- [47] TUTHILL ALL PLASTIC METERING PUMP MACHINERY AND PRODUCTION ENGINEERING, 1971, 118 (3049): : 626 - &
- [48] A pump expert's view on the metering pump technology evolution JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2006, 98 (06): : 63 - 64
- [49] CYCLE TIMER CONVERTS AIR PUMP TO METERING PUMP. Design News (Boston), 1986, 42 (07): : 144 - 145
- [50] Recent analysis of the running plunger pump, model Mawald. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1930, 74 : 168 - 170