共 50 条
- [1] SCHEDULING OF PROJECT NETWORKS BY JOB ASSIGNMENT [J]. MANAGEMENT SCIENCE, 1991, 37 (12) : 1590 - 1602
- [3] Using Hybrid Bayesian Networks to Model Dependent Project Scheduling Networks [J]. ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 7, PROCEEDINGS, 2008, : 163 - +
- [4] A Simple Approach to Project Scheduling in Networks with Stochastic Durations [J]. WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL I, 2011, : 560 - 565
- [5] Survey and analysis on the dependence of activity durations in project scheduling networks [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 86 - 90
- [6] Modeling correlation in project scheduling networks (ID: 5-047) [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 1876 - 1884
- [7] Project scheduling using state-based probabilistic decision networks [J]. 1998 WINTER SIMULATION CONFERENCE PROCEEDINGS, VOLS 1 AND 2, 1998, : 1287 - 1295
- [8] A GENETIC ALGORITHM FOR PROJECT SCHEDULING IN ACTIVITY NETWORKS UNDER RESOURCE COMPLEMENTARITY [J]. ECEC' 2011:17TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE / 7TH FUTURE BUSINESS TECHNOLOGY CONFERENCE, 2011, : 95 - 99