共 50 条
- [31] FLOATING PRODUCTION SYSTEM INSURES BUCHAN FIELD SUCCESS. Petroleum Engineer International, 1980, 52 (04): : 13 - 16
- [32] Rigid risers for floating production systems in deepwater field developments Pipes and Pipelines International, 2000, 45 (01): : 21 - 34
- [34] Experimental Analysis Study Wave Drift Force of Moored Floating Production Units (FPU) MAKARA JOURNAL OF TECHNOLOGY, 2024, 28 (01):
- [38] Development of a Tool for Automatic Coverage Assessment and Simulation of Production Plans 2022 17TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI), 2022,
- [39] SIMULATION OF PERFORMANCE INSOLES PLANS FOR THE DEVELOPMENT OF SOLAR FIELD IN ALGERIA TERRAGREEN 2012: CLEAN ENERGY SOLUTIONS FOR SUSTAINABLE ENVIRONMENT (CESSE), 2012, 18 : 1220 - 1227