共 50 条
- [41] Relationship between job burnout and job stressors and job satisfaction Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2009, 33 (04): : 548 - 554
- [42] Design of An Automatic Production Monitoring System on Job Shop Manufacturing 3RD INTERNATIONAL CONFERENCE ON INDUSTRIAL, MECHANICAL, ELECTRICAL, AND CHEMICAL ENGINEERING, 2018, 1931
- [43] PROPS - AN INTERACTIVE SIMULATOR FOR JOB SHOP PRODUCTION SYSTEM EVALUATION NEC RESEARCH & DEVELOPMENT, 1983, (71): : 89 - 97
- [45] Relationship between CCL21 production and synovial vascular system in rheumatoid arthritis ARTHRITIS AND RHEUMATISM, 2004, 50 (09): : S89 - S89
- [47] MULTI-JOB CYCLIC SCHEDULING FOR AN AUTOMATED FLOW-TYPE MANUFACTURING SYSTEM (RELATIONSHIP BETWEEN JOB OUTPUT INTERVAL AND BUFFER CAPACITY). Nippon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 1987, 53 (493): : 2054 - 2059
- [48] THE INTERRELATION BETWEEN THE ECONOMIC SYSTEM AND THE INFORMATIONAL SYSTEM IN THE PETROLEUM PRODUCTION KNOWLEDGE MANAGEMENT AND INNOVATION IN ADVANCING ECONOMIES-ANALYSES & SOLUTIONS, VOLS 1-3, 2009, : 331 - 337
- [49] THE INTERRELATION BETWEEN THE ECONOMIC SYSTEM AND THE INFORMATIONAL SYSTEM IN THE PETROLEUM PRODUCTION 15TH INTERNATIONAL CONFERENCE THE KNOWLEDGE-BASED ORGANIZATION: ECONOMICS SCIENCE, CONFERENCE PROCEEDINGS 3, 2009, 3 : 299 - 303
- [50] Technicians to revamp credentialing system, title JAVMA-JOURNAL OF THE AMERICAN VETERINARY MEDICAL ASSOCIATION, 2016, 249 (08): : 864 - 865