This paper describes post-tensioned timber alternative designs for a six-storey office building in New Zealand. The building has long-span timber-concrete composite floors supported on laminated veneer lumber beams, columns and walls. Lateral loads are resisted with moment-resisting post-tensioned timber frames in one direction and post-tensioned cantilever timber walls in the other direction. This paper compares the time and cost of timber construction with the concrete building actually being constructed. Construction times of the timber and concrete buildings are found to be almost identical. The cost of the timber alternative is approximately 6% more than concrete or steel designs. This paper demonstrates the opportunity for post-tensioned timber to compete with concrete and steel for multistorey long-span office buildings, providing a more sustainable alternative.
引用
收藏
页码:141 / 149
页数:9
相关论文
共 50 条
  • [21] Effect of partition walls on the seismic response of mass-timber buildings with a post-tensioned rocking wall system
    Hasani, Hamed
    Ryan, L. Keri
    [J]. ENGINEERING STRUCTURES, 2022, 262
  • [22] Post-tensioned Flat Slabs with Unbonded Tendons for Public Buildings
    Torok, Iosif
    Puskas, Attila
    Virag, Jacint
    [J]. 12TH INTERNATIONAL CONFERENCE INTERDISCIPLINARITY IN ENGINEERING (INTER-ENG 2018), 2019, 32 : 102 - 109
  • [23] Use of Post-tensioned Concrete Slabs for Sustainable Design of Buildings
    Suleymanoglu, Hikmet
    Uzel, Almila
    Arslan, Guray
    [J]. HIGH TECH CONCRETE: WHERE TECHNOLOGY AND ENGINEERING MEET, 2018, : 2390 - 2395
  • [24] Optimization of post-tensioned concrete slabs for minimum cost
    Zelickman, Yakov
    Amir, Oded
    [J]. Engineering Structures, 2022, 259
  • [25] Optimization of post-tensioned concrete slabs for minimum cost
    Zelickman, Yakov
    Amir, Oded
    [J]. ENGINEERING STRUCTURES, 2022, 259
  • [26] Section analysis and cyclic behavior of post-tensioned jointed ductile connections for multi-story timber buildings
    Newcombe, M. P.
    Pampanin, S.
    Buchanan, A.
    Palermo, A.
    [J]. JOURNAL OF EARTHQUAKE ENGINEERING, 2008, 12 : 83 - 110
  • [27] CHALLENGES OF SEISMIC DETAILING ON THE FIRE PERFORMANCE OF POST-TENSIONED TIMBER FRAMES
    Horne, Paul D.
    Palermo, Alessandro A.
    Abu, Anthony K.
    Moss, Peter J.
    [J]. BULLETIN OF THE NEW ZEALAND SOCIETY FOR EARTHQUAKE ENGINEERING, 2022, 55 (04): : 229 - 240
  • [28] Behaviour of Post-Tensioned Kempas Timber Beam with Two Tendon Types
    Mushina, W.
    Chuan, D. Y. Eng
    Mushina, J.
    Abd Ghafar, N.
    Boon, K.
    [J]. 2ND GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING, 2020, 713
  • [29] A Fully Coupled Numerical Model for Unbonded Post-tensioned Timber Structures
    Dincer, A. Ersin
    Demir, Abdullah
    [J]. EUROPEAN JOURNAL OF WOOD AND WOOD PRODUCTS, 2024, 82 (04) : 943 - 956
  • [30] RECOMMENDED PRACTICE FOR PRECAST POST-TENSIONED SEGMENTAL CONSTRUCTION
    PODOLNY, W
    ARAFAT, MZ
    DARCY, TJ
    GLOYD, CS
    JANSSEN, HH
    KEALEY, TR
    KORETZKY, HP
    MCCLURE, RM
    MUJUMDAR, V
    PETERSON, CA
    REINHARDT, P
    ROBINSON, F
    SLAVIS, C
    SUAREZ, MG
    SWANSON, D
    TANG, MC
    YANG, YC
    ZIA, P
    ZIELINSKI, ZA
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1982, 27 (01): : 14 - 61