Toward productivity improvement in electrical engineering documentation

被引:5
|
作者
Zhou, J. [1 ]
Love, P. E. D. [1 ]
Matthews, J. [2 ]
Carey, B. [2 ]
Sing, C. P. [2 ]
Edwards, D. J. [3 ]
机构
[1] Curtin Univ, Dept Civil Engn, Perth, WA, Australia
[2] Curtin Univ, Dept Construct Management, Perth, WA, Australia
[3] Birmingham City Univ, Birmingham Business Sch, Birmingham, W Midlands, England
基金
澳大利亚研究理事会;
关键词
CAD; Errors; FPSO; Omissions; RFI; SIM;
D O I
10.1108/IJPPM-10-2014-0151
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to determine the unproductive time and additional cost to re-engineer a safety control system for a Floating Production Storage Offloading vessel that was originally engineered and documented in computer-aided design (CAD). Design/methodology/approach - The "As-Built" drawings contained numerous errors and omissions, which resulted in a "requests for information" being raised and productivity rates reduced these costs and productivity losses are quantified. The use of CAD to originally engineer and document the safety control system was found to be inefficient as a 1:n relationship existed. Systems Information Models (SIMs) presents an alternative method to produce engineering documentation for the safety control system; where a 1:1 relationship is created between the model and the real objects. By constructing a 1:1 model, information redundancy can be eliminated, which reduces the propensity for errors and omissions to be made by engineers. Findings - The use of a SIM to re-engineer and document the new safety control system resulted in significant productivity benefits being achieved. Consequently, it is proffered that a paradigm shift from a 1:n to 1:1 perspective is required for engineering electrical and instrumentation systems so as to ameliorate the quality of documentation produced and productivity. Originality/value - The paper concludes by suggesting that future research is required to examine how processes and procedures can be re-designed to accommodate the use of a SIM.
引用
收藏
页码:1024 / 1040
页数:17
相关论文
共 50 条
  • [31] THE DOCUMENTATION OF MECHANICAL ENGINEERING
    EVERETT, RT
    [J]. ASLIB PROCEEDINGS, 1957, 9 (02): : 41 - 55
  • [32] Interactive engineering documentation
    Ludford, A
    Art, D
    [J]. 1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 196 - 196
  • [33] Outsourcing engineering and documentation
    Starr, GI
    [J]. ELECTRO '96 - PROFESSIONAL PROGRAM PROCEEDINGS, 1996, : 323 - 327
  • [34] Electrical engineering: Toward a proposal for a curriculum design to develop competences
    Marulanda, Agustín
    Pires, María
    Delgado, José Gregorio
    [J]. Revista de la Facultad de Ingenieria, 2010, 25 (03): : 67 - 75
  • [35] Unintended Consequences of Productivity Improvement Strategies on Safety Behaviour of Construction Labourers; A Step toward the Integration of Safety and Productivity
    Ghodrati, Nariman
    Yiu, Tak Wing
    Wilkinson, Suzanne
    Poshdar, Mani
    Talebi, Saeed
    Elghaish, Faris
    Sepasgozar, Samad M. E.
    [J]. BUILDINGS, 2022, 12 (03)
  • [36] SayMore, a tool for Language Documentation Productivity
    Moeller, Sarah Ruth
    [J]. LANGUAGE DOCUMENTATION & CONSERVATION, 2014, 8 : 66 - 74
  • [37] PRODUCTIVITY IMPROVEMENT
    FAIRHOLM, GW
    [J]. STATE GOVERNMENT, 1977, 50 (03) : 170 - 178
  • [38] INEFFECTIVE COMPUTER DOCUMENTATION - THE ENEMY OF PRODUCTIVITY
    ROBERTS, AH
    [J]. PROCEEDINGS OF THE AMERICAN SOCIETY FOR INFORMATION SCIENCE, 1983, 20 : 66 - 68
  • [39] ATTENDANCE IMPROVEMENT IS PRODUCTIVITY IMPROVEMENT
    WALTERS, WD
    [J]. CIM BULLETIN, 1986, 79 (887): : 79 - 79
  • [40] Productivity improvement
    Meyersdorf, D.
    [J]. Surface mount technology, 1998, 12 (01):