共 50 条
- [34] OPTIMIZING RUBBER EXTRUSION PERFORMANCE WITH SQC [J]. QUALITY PROGRESS, 1983, 16 (02) : 41 - 41
- [35] THE LEGITIMATE ROLE OF INSPECTION IN MODERN SQC [J]. AMERICAN STATISTICIAN, 1986, 40 (04): : 325 - 328
- [37] Case study of SQC in continuous extrusion [J]. ANTEC'97 - PLASTICS SAVING PLANET EARTH, CONFERENCE PROCEEDINGS, VOLS 1 - 3, 1997, : 3382 - 3388
- [38] INSTALLING AND OPERATING AN SPC/SQC SYSTEM [J]. I&CS-CONTROL TECHNOLOGY FOR ENGINEERS AND ENGINEERING MANAGEMENT, 1986, 59 (11): : 27 - 31