The use of a decision support tool in construction dispute negotiation

被引:0
|
作者
Cheung, Sai On [1 ]
Yiu, Kenneth T. W. [1 ]
Chung, Ryan K. H. [1 ]
机构
[1] City Univ Hong Kong, Dept Bldg & Construct, Construct Dispute Resolut Res Unit, Kowloon, Peoples R China
来源
AUSTRALASIAN DISPUTE RESOLUTION JOURNAL | 2005年 / 16卷 / 03期
关键词
D O I
暂无
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Negotiation is an indispensable part of dispute resolution in the construction industry. Disputants should be well prepared before the process begins. To achieve this, one of the prerequisites in preparing construction dispute negotiation is to understand one's case, in particular, the bottom line. The decision-maker can conduct self-analysis and prepare alternatives before any resolution process begins. This article aims to introduce the use of a decision support tool, modelled on the technique of a decision tree, to achieve such purposes. The tool operates on a computing environment provided by a software called "Precision Tree". The operation procedure of the analysis shall include three stages: (1) issue identification, (2) outcome identification and (3) analysis. A hypothetical case is used to illustrate the working of this tool. As such, a decision-maker can identify the probability of success and the expected profit for each alternative in this case. With the use of sensitivity analysis, the bottom line figure of each issue can be identified. It is suggested that using such a decision support tool enables a systematic and rational self-analysis in preparing for construction dispute negotiation.
引用
收藏
页码:170 / 186
页数:17
相关论文
共 50 条
  • [1] Contingent Use of Negotiators' Tactics in Construction Dispute Negotiation
    Cheung, Sai On
    Chow, Pui Ting
    Yiu, Tak Wing
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (06) : 466 - 476
  • [2] Decision support system for dispute resolution in construction contracts
    Chaphalkar, N. B.
    Patil, Smita K.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (04) : 499 - 504
  • [3] Decision support system for dispute resolution in construction contracts
    N. B. Chaphalkar
    Smita K. Patil
    KSCE Journal of Civil Engineering, 2012, 16 : 499 - 504
  • [4] Special Issue on Construction Dispute Negotiation: Nuts and Bolts of Negotiation as a Means of Construction Dispute Resolution Introduction
    Cheung, Sai On
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2011, 3 (03) : 93 - 93
  • [5] The value of apology in construction dispute negotiation
    Cheung, Sai On
    Zhu, Liuying
    Yu, Ka In
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (10) : 1910 - 1923
  • [6] Withdrawal in Construction Project Dispute Negotiation
    Cheung, Sai On
    Chow, Pui Ting
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (12) : 1071 - 1079
  • [7] A study of styles and outcomes in construction dispute negotiation
    Cheung, Sai On
    Yiu, Tak Wing Yiu
    Yeung, Sau Fung
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (08) : 805 - 814
  • [8] Using Case-Based Reasoning and Principled Negotiation to provide decision support for dispute resolution
    Carneiro, Davide
    Novais, Paulo
    Andrade, Francisco
    Zeleznikow, John
    Neves, Jose
    KNOWLEDGE AND INFORMATION SYSTEMS, 2013, 36 (03) : 789 - 826
  • [9] Using Case-Based Reasoning and Principled Negotiation to provide decision support for dispute resolution
    Davide Carneiro
    Paulo Novais
    Francisco Andrade
    John Zeleznikow
    José Neves
    Knowledge and Information Systems, 2013, 36 : 789 - 826
  • [10] Reactive Devaluation as a Psychological Impediment to Construction Dispute Negotiation
    Cheung, Sai On
    Li, Keyao
    Chow, On Yi
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (04)