INTEGRATION OF PROJECT MANAGEMENT WITH THE PROPOSED STAGE-GATE (R): THE TUNING PROJECT CASE REPORT

被引:0
|
作者
Sabino, Michelle de Stefano [1 ,2 ]
Montenegro Duarte, Cassio Chagas [1 ,3 ]
机构
[1] Univ Nove Julho, UNINOVE, MPA GP, Programa Mestrado Profiss Adm Gestao Projetos, Sao Paulo, Brazil
[2] Anhanguera Educ, Sao Jose Dos Campos, Brazil
[3] Companhia Proc Dados Estado Sao Paulo, Informat, Sao Paulo, Brazil
来源
REVISTA DE GESTAO E PROJETOS | 2011年 / 2卷 / 02期
关键词
Projects Management; Stage-Gate (R); Integration of Processes;
D O I
10.5585/gep.v2i2.53
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper aims to describe and to analyze the integration observed in the Sintonia project with respect to the comparison of project management processes to the model of the Stage-Gate (R). The literature addresses these issues conceptually, but lack an alignment between them that is evident in practice. As a method was used single case study. The report is as if the Sintonia project, developed by PRODESP - Data Processing Company of Sao Paulo. The results show the integration of project management processes with the Stage-Gate model developed during the project life cycle. The formalization of the project was defined in stages in which allowed the exploitation of economies of repetition and recombination to the development of new projects. This study contributes to the technical vision in dealing with the integration of project management processes. It was concluded that this system represents an attractive way, in terms of creating economic value and technological innovation for the organization.
引用
收藏
页码:184 / 213
页数:30
相关论文
共 50 条
  • [31] Case Studies in Project, Program and Organisational Project Management
    Waheed, Zehra
    FACILITIES, 2016, 34 (5-6) : 375 - 376
  • [32] Management and the effect of MITI's R&D project: case study from a supercomputer project
    Nakamura, Y
    Watanabe, C
    TECHNOVATION, 2003, 23 (03) : 221 - 238
  • [33] Case Studies in Project, Program, and Organizational Project Management
    Frame, J. Davidson
    PROJECT MANAGEMENT JOURNAL, 2012, 43 (02) : 103 - 103
  • [34] Project Flip: A Project Management Case/Exercise Experience
    Heineke, Janelle
    Meile, Larry
    Liu, Linda Boardman
    Davies, Jane
    DECISION SCIENCES-JOURNAL OF INNOVATIVE EDUCATION, 2010, 8 (01) : 113 - 127
  • [35] Impact of integration management on construction project management performance
    Demirkesen, Sevilay
    Ozorhon, Beliz
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (08) : 1639 - 1654
  • [36] PROPOSED GASQUET MOUNTAIN PROJECT ENTERS AN ENGINEERING STUDY STAGE
    TODD, JC
    E&MJ-ENGINEERING AND MINING JOURNAL, 1983, 184 (06): : 29 - +
  • [37] A proposed framework for defining the relationship between complexity, project categorization, and project risk management: Case study of a medical company in Morocco
    Zaki, Mohamed
    Aziz, E. T. Tahir
    Oussama, Jami
    Elallam, Oussama
    El Ghoubali, Douae
    Jhilal, Fayssal
    Alidrissi, Najib
    Ghazal, Hassan
    Benmoussa, Adnane
    Bakkali, Fadil
    HELIYON, 2024, 10 (14)
  • [38] Integration analysis of enterprise project management and strategic management
    Lu, WX
    An, SL
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1441 - 1444
  • [39] THE STAGE-GATE APPLIED TO NEW PRODUCT DEVELOPMENT: THE CASE OF LEADING COMPANIES IN SOUTHERN BRAZIL
    Ferro de Guimaraes, Julio Cesar
    Severo, Eliana Andrea
    Severo, Pedro Orlando
    REVISTA GEINTEC-GESTAO INOVACAO E TECNOLOGIAS, 2019, 9 (04): : 5166 - 5181
  • [40] Quality Management System Proposed to JENDL Evaluation Project
    Yamano, N.
    Yoshida, T.
    Nakajima, K.
    Ishikawa, M.
    Shibata, K.
    Suyama, K.
    Okumura, K.
    Iwamoto, O.
    Uematsu, M.
    Tahara, Y.
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2011, 59 (02) : 1298 - 1302