A PROJECT MODEL IN MANAGING PRODUCTION RAMP-UP - A CASE STUDY IN WIRE HARNESS INDUSTRY

被引:5
|
作者
Kontio, Jyri [1 ]
Haapasalo, Harri [2 ]
机构
[1] PKC Grp Oyj, POB 174, FIN-90401 Oulu, Finland
[2] Univ Oulu, Dept Ind Engn & Management, FIN-90014 Oulu, Finland
关键词
Project management; production ramp-up; process planning;
D O I
10.1142/S021987700500037X
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
As a result of fierce competition, companies are striving for internal efficiency in all their functions and operations. Different theoretical perspectives for management exist, and there are always new expectations and requirements such as in the management of production ramp-up. The purpose of this paper is to present a project model to enhance process planning and production ramp-up in project management. The case project is in the wire harness industry. The paper illustrates practices for project management based on relevant literature.
引用
收藏
页码:101 / 117
页数:17
相关论文
共 50 条
  • [31] A comparative study on production ramp-up: state-of-the-art and new challenges
    Surbier, Laurene
    Alpan, Guelguen
    Blanco, Eric
    [J]. PRODUCTION PLANNING & CONTROL, 2014, 25 (15) : 1264 - 1286
  • [32] Production planning for a ramp-up process with learning in production and growth in demand
    Glock, Christoph H.
    Jaber, Mohamad Y.
    Zolfaghari, Saeed
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5707 - 5718
  • [33] A comparative study of turbulence in a ramp-up and a ramp-down flow
    Seddighi, M.
    He, S.
    Orlandi, P.
    Vardy, A.
    [J]. TURBULENCE, HEAT AND MASS TRANSFER 6, 2009, : 359 - 362
  • [34] Production ramp-up in European automotive production systems: a performance analysis
    Viles, Elisabeth
    Bulto, Ramon
    Mateo, Ricardo
    Jurburg, Daniel
    [J]. PRODUCTION PLANNING & CONTROL, 2021, 32 (01) : 34 - 51
  • [35] Phase-out integrated ramp-up production. Challenges of planning manufacturing systems in the phase-out integrated ramp-up production
    Bergs, Thomas
    Apelt, Sebastian
    Rey, Jan
    Trauth, Daniel
    [J]. WT Werkstattstechnik, 2019, 109 (06): : 452 - 456
  • [36] Production quality improvement during manufacturing systems ramp-up
    Colledani, M.
    Tolio, T.
    Yemane, A.
    [J]. CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2018, 23 : 197 - 206
  • [37] Investigating the Impact of Product Volume and Variety on Production Ramp-Up
    Andersen, Ann-Louise
    Bejlegaard, Mads
    Brunoe, Thomas D.
    Nielsen, Kjeld
    [J]. MANAGING COMPLEXITY, 2017, : 421 - 434
  • [38] Supplier Management by Ramp-up Competent Production Systems Design
    Heins, Michael
    Klemke, Tim
    Schulze, Candy Patrick
    [J]. PPS MANAGEMENT, 2008, 13 (04): : 29 - 32
  • [39] Identification of Residual Development Efforts in Agile Ramp-Up Production
    Bergs, Thomas
    Apelt, Sebastian
    Becker, Malte
    Beckers, Alexander
    Barth, Sebastian
    [J]. SMART, SUSTAINABLE MANUFACTURING IN AN EVER-CHANGING WORLD, COMA '22, 2023, : 3 - 15
  • [40] Don't wait for ramp-up: Simulate production now
    Palmer, Dean
    [J]. Manufacturing Computer Solutions, 2002, 8 (08): : 39 - 41