共 50 条
- [22] Time to retire the Internal Rate of Return as a project evaluation criterion MINING IN THE NEW MILLENNIUM CHALLENGES AND OPPORTUNITIES, 2000, : 285 - 290
- [23] Optimization of machining economics and energy consumption in face milling operations INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 99 (9-12): : 2093 - 2100
- [24] Optimization of machining economics and energy consumption in face milling operations Wang, Yi-Chi (wangyc@fcu.edu.tw), 1600, Springer London (99): : 9 - 12