THE R-AND-D PROJECT SELECTION PROBLEM WITH FUZZY COEFFICIENTS

被引:22
|
作者
DIAS, OP
机构
[1] Ministerio da Ciencia &, Tecnologia, Sao Jose, Braz, Ministerio da Ciencia & Tecnologia, Sao Jose, Braz
关键词
COMPUTER PROGRAMMING - Algorithms - MATHEMATICAL PROGRAMMING - MATHEMATICAL TECHNIQUES - Fuzzy Sets;
D O I
10.1016/0165-0114(88)90125-X
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper deals with the multicriteria project selection problem subject to linear constraints, with zero-one decision variables. Linguistic rather than numerical values are used in the project appraisals for each criterion, with their meanings represented by normal fuzzy sets. The grade of membership of a given alternative, in the fuzzy set of all nondominated alternatives, is computed by an algorithm that converges rapidly on the final solution. Continuity and normality are the only restrictions imposed on the membership functions. An example of the overall procedure and topics for future research are presented.
引用
收藏
页码:299 / 316
页数:18
相关论文
共 50 条
  • [41] A PRODUCTION PROBLEM SOLVED ... BY AN R-AND-D TASK-FORCE
    MILLER, RS
    [J]. CHEMTECH, 1983, 13 (03) : 152 - 155
  • [42] THE RELATIONSHIP BETWEEN FEDERAL CONTRACT R-AND-D AND COMPANY R-AND-D
    LICHTENBERG, FR
    [J]. AMERICAN ECONOMIC REVIEW, 1984, 74 (02): : 73 - 78
  • [43] Multiple criteria R&D project selection and scheduling using fuzzy logic
    Coffin, MA
    Taylor, BW
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (03) : 207 - 220
  • [44] A fuzzy AHP application in government-sponsored R&D project selection
    Huang, Chi-Cheng
    Chu, Pin-Yu
    Chiang, Yu-Hsiu
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (06): : 1038 - 1052
  • [45] A Fuzzy Multi-criteria Evaluation Approach for R&D Project Selection
    Yi, Changsheng
    Ning, Yufu
    Jin, Qiumei
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7598 - +
  • [46] A Decision-making Approach for R&D Project Selection in a Fuzzy Environment
    Yi, Changsheng
    [J]. ISBIM: 2008 INTERNATIONAL SEMINAR ON BUSINESS AND INFORMATION MANAGEMENT, VOL 1, 2009, : 372 - 375
  • [47] A fuzzy model for R&D project selection with benefit, outcome and resource interactions
    Kuchta, Dorota
    [J]. Engineering Economist, 2001, 46 (03): : 164 - 180
  • [48] Fuzzy multicriteria R&D project selection with a real options valuation model
    Tolga, A. Cagri
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2008, 19 (4-5) : 359 - 371
  • [49] R&D project selection versus R&D project generation
    Bordley, RF
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1998, 45 (04) : 407 - 413
  • [50] R-AND-D ON KEVLAR
    WAGNER, PL
    [J]. ASTRONAUTICS & AERONAUTICS, 1982, 20 (06): : 33 - 34