BBC - PLANT PLANNING GAME - MODEL CONSTRUCTION AND APPLICATION PRACTICE

被引:0
|
作者
SEIDEL, E [1 ]
BERGER, H [1 ]
AUBURGER, M [1 ]
机构
[1] UNIV SIEGEN,D-5900 SIEGEN,FED REP GER
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:63 / 81
页数:19
相关论文
共 50 条
  • [21] Using game technologies to improve the safety of construction plant operations
    Guo, Hongling
    Li, Heng
    Chan, Greg
    Skitmore, Martin
    ACCIDENT ANALYSIS AND PREVENTION, 2012, 48 : 204 - 213
  • [22] Application of Game Theory in Path Planning of Multiple Robots
    Jasna, S. B.
    Supriya, P.
    Nambiar, T. N. P.
    2017 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING, INSTRUMENTATION AND CONTROL TECHNOLOGIES (ICICICT), 2017, : 147 - 151
  • [23] Design and application practice of optimization model for refining and chemical integrated intelligent plant
    Wang H.
    Yang L.
    Wang H.
    Dong F.
    Huagong Jinzhan/Chemical Industry and Engineering Progress, 2021, 40 (S2): : 451 - 455
  • [24] Reflective practice and technical rationality in construction project planning
    Rotimi, James Olabode Bamidele
    Ramanayaka, Chamila D. D.
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2015, 32 (04) : 301 - 315
  • [25] Resource conservation in construction - aspects from planning practice
    Schadow, Thomas
    BAUTECHNIK, 2022, 99 (01) : 50 - 56
  • [26] EFFECT ON PLANNING, CONSTRUCTION, OPERATIONS - EXAMPLES FROM PRACTICE
    HANEWINCKEL, D
    FISCHER, W
    OSTLER, J
    WUNSCH, D
    STAHL UND EISEN, 1977, 97 (22): : 28 - 28
  • [27] Network planning and procedure observation during plant construction
    Hladki, Nevenko
    Energija, 47 (04): : 291 - 297
  • [28] PLANNING CONSTRUCTION AND EXPERIENCES MADE WITH A NEW FORGING PLANT
    WALDHERR, E
    STAHL UND EISEN, 1969, 89 (08): : 389 - &
  • [29] Active viewpoint planning for model construction
    Chen, SY
    Li, YF
    2004 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1- 5, PROCEEDINGS, 2004, : 4411 - 4416
  • [30] Planning and construction of Niederaußem pilot drying plant
    Elsen, R.
    Blumenthal, U.
    Götte, C.
    Kamm, J.
    Von Kossak, T.
    VGB PowerTech, 2001, 81 (06): : 6 - 7