BBC - PLANT PLANNING GAME - MODEL CONSTRUCTION AND APPLICATION PRACTICE

被引:0
|
作者
SEIDEL, E [1 ]
BERGER, H [1 ]
AUBURGER, M [1 ]
机构
[1] UNIV SIEGEN,D-5900 SIEGEN,FED REP GER
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:63 / 81
页数:19
相关论文
共 50 条
  • [1] The Application of Artificial Intelligence Planning and Scheduling in Photovoltaic Plant Construction Projects
    Ruiz, Jesus Gil
    Diaz, Hernan
    Crespo, Ruben Gonzalez
    EXPERT SYSTEMS, 2025, 42 (02)
  • [2] APPLICATION OF METHODS OF AUTOMATIC CLASSIFICATION TO CONSTRUCTION OF A STATIC MODEL OF A PLANT
    DOROFEYUK, AA
    KASAVIN, AD
    TORGOVIT.IS
    AUTOMATION AND REMOTE CONTROL, 1970, (01) : 128 - +
  • [3] Planning repetitive construction: Current practice
    Lutz, James D.
    Hijazi, Adib
    Construction Management and Economics, 1993, 11 (02) : 99 - 110
  • [4] PLANNING OF UTILITIES FOR POWER PLANT CONSTRUCTION
    Brittle, William F.
    Journal of the Construction Division, 1981, 107 (02): : 161 - 168
  • [5] APPLICATION OF THE GAME THEORY IN CONSTRUCTION ACTIVITY
    Kopytina, E. A.
    Petrikeeva, N. A.
    Tul'skaya, S. G.
    Kuznetsov, S. N.
    RUSSIAN JOURNAL OF BUILDING CONSTRUCTION AND ARCHITECTURE, 2019, (01): : 68 - 76
  • [6] Game-Theory in Practice: Application to Motion Planning and Decision Making in an Autonomous Shuttle Bus
    Shu, Keqi
    Alghooneh, Ahmad Reza
    Ning, Minghao
    Li, Shen
    Pirani, Mohammad
    Khajepour, Amir
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2024, 25 (11) : 18624 - 18635
  • [7] Construction and Application Practice of Early Warning Model for Investment Progress of Electricity Grid Construction Projects
    Gao, Qian
    Yang, Junyi
    Liu, Kai
    Jin, Cheng
    Wang, Jing
    Huang, He
    Tang, Jie
    Li, Shaoqiang
    Dai, Keli
    2019 5TH INTERNATIONAL CONFERENCE ON ENERGY EQUIPMENT SCIENCE AND ENGINEERING, 2020, 461
  • [8] PLANNING MODEL FOR CONSTRUCTION MINERALS
    BISHKO, D
    WALLACE, WA
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1972, 18 (10): : B502 - +
  • [10] STATUS OF THE PLANNING AND CONSTRUCTION OF THE WACKERSDORF REPROCESSING PLANT
    MATTERN, J
    COLLECTION OF PAPERS FROM THE 7TH STATUS REPORT OF THE WASTE TREATMENT AND REPROCESSING PROJECT: 15/16 MARZ 1988, 1988, : 51 - 54