SINGLE-MACHINE SCHEDULING;
BATCH DELIVERY;
COMMON DUE DATE;
D O I:
10.1016/0377-2217(93)90239-J
中图分类号:
C93 [管理学];
学科分类号:
12 ;
1201 ;
1202 ;
120202 ;
摘要:
In this paper, we consider a single-machine scheduling problem where all jobs have a common due date. The problem is to minimize the sum of earliness and tardiness penalties and the delivery costs of the tardy jobs, where the tardy jobs are delivered in batches with a fixed cost per batch. Our approach is to use a pseudo-polynomial dynamic programming algorithm to solve the problem. We also discuss some special cases that are solvable in polynomial time and show that for a given schedule of tardy jobs, the problem of scheduling the batch deliveries is equivalent to the dynamic lot sizing problem. We describe how the general problem is much more difficult. Finally, we present the results of empirical testing of the dynamic program and a number of heuristics developed.
机构:
E China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang 330013, Peoples R China
E China Inst Technol, Sch Sci, Fuzhou 344000, Jiangxi, Peoples R ChinaFeng Chia Univ, Dept Stat, Taichung 40724, Taiwan
Yin, Yunqiang
Cheng, T. C. E.
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R ChinaFeng Chia Univ, Dept Stat, Taichung 40724, Taiwan
Cheng, T. C. E.
Xu, Dehua
论文数: 0引用数: 0
h-index: 0
机构:
E China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang 330013, Peoples R China
E China Inst Technol, Sch Sci, Fuzhou 344000, Jiangxi, Peoples R ChinaFeng Chia Univ, Dept Stat, Taichung 40724, Taiwan