共 50 条
- [1] RESULTS OF TEST RUNS FOR STUDYING THE DYNAMICS OF THE UNIT-3 AND UNIT-4 OF THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER [J]. KERNENERGIE, 1980, 23 (08): : 302 - 307
- [3] THE INCORE MEASURING SYSTEM OF THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER [J]. KERNENERGIE, 1980, 23 (06): : 226 - 229
- [4] ERECTION AND START-UP OF FIRST UNIT OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 222 - 230
- [5] APPLICATION OF NOISE DIAGNOSTICS TO PLANT MONITORING IN THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1989, 32 (08): : 329 - 333
- [6] NUCLEAR SAFETY IN GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 230 - 232
- [7] NUCLEAR FUEL SUPPLY OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 234 - 236
- [8] SITE AND TERRITORIAL INTEGRATION OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 189 - 191
- [9] STRUCTURE AND PROSPECTIVE EVOLUTION OF MAINTENANCE SYSTEM OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 232 - 234
- [10] PHYSICAL START-UP OF REACTOR OF BRUNO LEUSCHNER NUCLEAR-POWER PLANT 1ST UNIT [J]. KERNENERGIE, 1976, 19 (04): : 107 - 112