共 50 条
- [1] NUCLEAR SAFETY IN GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 230 - 232
- [2] NUCLEAR FUEL SUPPLY OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 234 - 236
- [3] NOISE SIGNAL MONITORING IN THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER BY USE OF THE TIERCE SPECTRA [J]. KERNENERGIE, 1984, 27 (01): : 10 - 14
- [4] SITE AND TERRITORIAL INTEGRATION OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 189 - 191
- [6] TRAINING OF PERSONNEL FOR FIRST BLOCK OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 236 - 238
- [7] STRUCTURE AND PROSPECTIVE EVOLUTION OF MAINTENANCE SYSTEM OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 232 - 234
- [8] ERECTION AND START-UP OF FIRST UNIT OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 222 - 230
- [9] THE INCORE MEASURING SYSTEM OF THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER [J]. KERNENERGIE, 1980, 23 (06): : 226 - 229
- [10] MASTER PLANNING, MASTER PLAN, AND DESCRIPTION OF ESSENTIAL SECONDARY TECHNOLOGICAL UNITS OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER [J]. KERNENERGIE, 1974, 17 (07): : 192 - 200