THE CAPTURE AND SEQUESTRATION OF POWER-PLANT CO2

被引:0
|
作者
HERZOG, HJ [1 ]
DRAKE, EM [1 ]
TESTER, JW [1 ]
机构
[1] MIT,MIT ENERGY LAB,CAMBRIDGE,MA 02139
关键词
D O I
暂无
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
引用
收藏
页码:16 / FUEL
相关论文
共 50 条
  • [41] Integration of Oxygen Transport Membranes in an IGCC power plant with CO2 capture
    Anantharaman, Rahul
    Bolland, Olav
    [J]. PRES 2011: 14TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1 AND 2, 2011, 25 : 25 - +
  • [42] Assessment of a Power Plant With CO2 Capture Using an Advanced Exergoenvironmental Analysis
    Petrakopoulou, Fontina
    Tsatsaronis, George
    Morosuk, Tatiana
    [J]. JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2014, 136 (02):
  • [43] Integration of the steam cycle and CO2 capture process in a decarbonization power plant
    Xu, Gang
    Hu, Yue
    Tang, Baoqiang
    Yang, Yongping
    Zhang, Kai
    Liu, Wenyi
    [J]. APPLIED THERMAL ENGINEERING, 2014, 73 (01) : 277 - 286
  • [44] A further step towards a Graz Cycle power plant for CO2 capture
    Sanz, W.
    Jericha, H.
    Luckel, F.
    Goettlich, E.
    Heitmeir, F.
    [J]. Proceedings of the ASME Turbo Expo 2005, Vol 5, 2005, : 181 - +
  • [45] Economic evaluation of A-USC power plant with CO2 capture unit
    Stepczynska-Drygas, Katarzyna
    Dykas, Slawomir
    Lukowicz, Henryk
    Czaja, Daniel
    [J]. JOURNAL OF POWER TECHNOLOGIES, 2015, 95 (05): : 75 - 83
  • [46] Integration of power plant and amine scrubbing to reduce CO2 capture costs
    Romeo, Luis M.
    Bolea, Irene
    Escosa, Jesus M.
    [J]. APPLIED THERMAL ENGINEERING, 2008, 28 (8-9) : 1039 - 1046
  • [47] Power-plant design should prepare for carbon capture
    Jon Gibbins
    [J]. Nature, 2005, 436 : 912 - 912
  • [48] Power generation with CO2 capture: Technology for CO2 purification
    Pipitone, Gabriele
    Bolland, Olav
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2009, 3 (05) : 528 - 534
  • [49] CO2 capture plant opens in Iceland
    Bettenhausen, Craig
    [J]. CHEMICAL & ENGINEERING NEWS, 2021, 99 (34) : 18 - 18
  • [50] LIFE-CYCLE ANALYSIS OF FOSSIL POWER-PLANT WITH CO2 RECOVERY AND SEQUESTERING SYSTEM
    WAKU, H
    TAMURA, I
    INOUE, M
    AKAI, M