共 50 条
- [22] Resource scheduling of construction projects using a hybrid genetic algorithm model [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209
- [23] d Investigatins the impact of using PMIS in resource management on cost of projects as a conceptual model in construction projects [J]. NEXO REVISTA CIENTIFICA, 2022, 35 (02): : 601 - 610
- [24] Using the ordinal priority approach for selecting the contractor in construction projects [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2023, 15 (01): : 136 - 156
- [25] Cost Estimation of Civil Construction Projects using Machine Learning Paradigm [J]. 2017 INTERNATIONAL CONFERENCE ON I-SMAC (IOT IN SOCIAL, MOBILE, ANALYTICS AND CLOUD) (I-SMAC), 2017, : 594 - 599