A PRAGMATIC APPROACH TO USING RESOURCE LOADING, PRODUCTION, AND LEARNING-CURVES ON CONSTRUCTION PROJECTS

被引:17
|
作者
WIDEMAN, RM
机构
关键词
LEARNING CURVE; PRODUCTIVITY IMPROVEMENT; PROGRESS (PRODUCTION) CURVE; RESOURCE LOADING;
D O I
10.1139/l94-100
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this paper is to present some rules of thumb, based on experience, for the early planning of new civil and building construction work. In such construction, resource input (men, materials, equipment, etc.) is varied according to the planned timing and availability of the work. On a well-run site, this resource loading as well as its consequent output follows a distinctive pattern within relatively narrow limits for the whole of the job. Practical considerations of why this should be so are presented. Based on experience, this paper suggests first approximation profiles for both typical resource loading and progress S-curves and shows that the difference could be due to the effects of learning. The basis for calculating the shape of the learning curve and how the application of this concept is limited on a construction site are described. The manner in which an alternative learning curve calculation can be more useful in tracking progress is demonstrated. The significance of these profiles and their relationships for improved planning and tracking of new construction work is suggested. An example of the output from a less well managed project as compared to the planned S-curve is also included.
引用
收藏
页码:939 / 953
页数:15
相关论文
共 50 条
  • [21] Integrating resource production and construction using BIM
    Babic, Nenad Cus
    Podbreznik, Peter
    Rebolj, Danijel
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (05) : 539 - 543
  • [22] Resource scheduling of construction projects using a hybrid genetic algorithm model
    Senouci, AB
    Naji, KK
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209
  • [23] d Investigatins the impact of using PMIS in resource management on cost of projects as a conceptual model in construction projects
    Mosavi, Seyed Karim
    Hosseini, Azim
    Vosoughifar, Hamid Reza
    Barandoust, Rambood
    Mohammadi, Ghodratollah
    [J]. NEXO REVISTA CIENTIFICA, 2022, 35 (02): : 601 - 610
  • [24] Using the ordinal priority approach for selecting the contractor in construction projects
    Alkaabi, Sajjad Ali Mahmood
    Mahjoob, Ahmed Mohammed Raoof
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2023, 15 (01): : 136 - 156
  • [25] Cost Estimation of Civil Construction Projects using Machine Learning Paradigm
    Arage, Sphurti S.
    Dharwadkar, Nagaraj V.
    [J]. 2017 INTERNATIONAL CONFERENCE ON I-SMAC (IOT IN SOCIAL, MOBILE, ANALYTICS AND CLOUD) (I-SMAC), 2017, : 594 - 599
  • [26] Cost Estimation of Metro Construction Projects Using Interpretable Machine Learning
    Meng, Chuncheng
    Qu, Daoyuan
    Duan, Xiaochen
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2024, 38 (06)
  • [27] Identifying Challenges of Internet of Things on Construction Projects Using Fuzzy Approach
    Amade, Benedict
    Nwakanma, Cosmas Ifeanyi
    [J]. Journal of Engineering, Project, and Production Management, 2021, 11 (03) : 215 - 227
  • [28] Distilling and managing engineers' experience in construction projects using a pattern approach
    Chang, Chin-Hsiang
    Lin, Yu-Cheng
    Tserng, H. Ping
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (03) : 209 - 223
  • [29] Stakeholder assessment in construction projects using a CRITIC-TOPSIS approach
    Gaur, Sulakshya
    Dosapati, Satyanarayana
    Tawalare, Abhay
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2023, 13 (02) : 217 - 237
  • [30] Assessment of labor productivity in construction projects using system dynamic approach
    Khanzadi, M.
    Kaveh, A.
    Alipour, M.
    Mohammadi, R. Khan
    [J]. SCIENTIA IRANICA, 2017, 24 (06) : 2684 - 2695