共 50 条
- [31] PROBLEMS RELATED TO COMMISSIONING OF NUCLEAR-POWER PLANT V-1 AND ITS CONTROL [J]. JADERNA ENERGIE, 1981, 27 (04): : 137 - 140
- [32] ELECTRICAL EQUIPMENT ASSOCIATED WITH 1200 MW BIBLIS-1 NUCLEAR-POWER PLANT [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (04): : 1731 - &
- [33] OPERATIONAL RESULTS OF STEAM-GENERATORS IN NUCLEAR-POWER PLANT OCONEE-1 [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1974, 19 (12): : 597 - 601
- [34] 10-YEAR REVIEW OF UNIT-1 OF THE TIHANGE NUCLEAR-POWER PLANT [J]. FIRE PROTECTION AND FIRE FIGHTING IN NUCLEAR INSTALLATIONS, 1989, : 67 - 74
- [35] DETERMINATION OF INTEGRATION STEP OF NUCLEAR-POWER PLANT DYNAMICS EQUATIONS WHEN SOLVING BY MEANS OF A DIGITAL-COMPUTER [J]. ATOMNAYA ENERGIYA, 1972, 32 (05): : 401 - &
- [36] DYNAMIC BEHAVIOR OF RHEINSBERG NUCLEAR-POWER PLANT IN DIFFERENT OPERATION REGIMES DURING STRETCH-OUT OF BURNUP [J]. KERNENERGIE, 1972, 15 (08): : 269 - +
- [37] STARTUP AND RESULTS FROM RECENT OPERATION OF BOHUNICE NUCLEAR-POWER PLANT A-1, CZECHOSLOVAKIA [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 20 (APR21): : 162 - 165
- [38] RETROFITTING AN OPERATING NUCLEAR-POWER PLANT MILLSTONE NPS - UNIT-1 RADWASTE MODIFICATION [J]. MECHANICAL ENGINEERING, 1975, 97 (02): : 48 - 48
- [39] DESIGN AND TECHNICAL SOLUTION OF THE NUCLEAR-POWER PLANT V-1 JASLOVSKE-BOHUNICE [J]. JADERNA ENERGIE, 1981, 27 (04): : 122 - 126