共 50 条
- [1] FINAL STEP IN DECOMMISSIONING OF SM-1 NUCLEAR-PLANT - CLOSE-OUT RADIATION SURVEY [J]. HEALTH PHYSICS, 1975, 29 (06): : 925 - 926
- [2] PLANNING FOR NUCLEAR-POWER PLANT DECOMMISSIONING [J]. POWER ENGINEERING, 1983, 87 (07) : 56 - 59
- [3] NUCLEAR-POWER PLANT DECOMMISSIONING COST RECOVERY [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 38 (JUN): : 138 - 139
- [4] NRC REGULATIONS FOR NUCLEAR-POWER PLANT DECOMMISSIONING [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 28 (JUN): : 669 - 669
- [5] DECOMMISSIONING A BOILING WATER-REACTOR NUCLEAR-POWER PLANT [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1980, 34 (JUN): : 741 - 742
- [6] AUTHORITIES SURVEY OF BUILDING NUCLEAR-POWER PLANT IN FINLAND [J]. ENERGIA ES ATOMTECHNIKA, 1979, 32 (5-6): : 198 - 200
- [7] SOME PROBLEMS WITH DETERMINATION OF ALPHA-ACTIVE NUCLIDES DURING DECOMMISSIONING OF NUCLEAR-POWER PLANT-A-1 [J]. JOURNAL OF RADIOANALYTICAL AND NUCLEAR CHEMISTRY-ARTICLES, 1988, 121 (02): : 395 - 401
- [9] THE PREPARATION OF MAINTENANCE NUCLEAR-POWER PLANT .1. THE FUNDAMENTAL PHILOSOPHY OF MAINTENANCE NUCLEAR-POWER PLANT WITH PWR REACTORS [J]. JADERNA ENERGIE, 1981, 27 (03): : 111 - 116
- [10] ANALYSIS OF NUCLEAR-POWER PLANT BREAKDOWNS .1. [J]. ENERGIA ES ATOMTECHNIKA, 1979, 32 (01): : 27 - 33