A SUPPLIER SELECTION MODEL FOR PROJECT PORTFOLIOS

被引:0
|
作者
Tosun, Suleyman [1 ]
Onut, Semih [1 ]
机构
[1] Yildiz Tekn Univ, Makine Fak, Endustri Muhendisligi Bolumu, Istanbul, Turkey
关键词
Project management; weighting projects; supplier selection; fuzzy ANP; QFD and pareto;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, one of the most important subjects for the companies which are profitable and have continuous management principles, is the fact of having targets. The project management discipline which is the most widely used technique to achieve the targets, is continuing its development. The knowledge areas and the processes for that management discipline are detailed in the guide of PMI (Project Management Institute), named as PMBOK (Project Management Body of Knowledge) which is the most popular approach in project management dicipline. Suppliers are appeared as elements which affect the success of projects in the project management knowledge areas. Having the necessary materials on time, on budget and with the quality desired directly affects project success. Consequently, this is a subject that affects the targets indirectly. There are a lot of models and techniques in supplier selection. In that point, we aim to have an upper look to the situation with the model offered. For that reason, the relations of the supplier subjects and the relation between the projects and the targets are in a critical chain. Supplier selection is associated with the targets in the model and it seems the first perspective in the literature with the model introduced. Also, the techniques used in the model are used together for the first time in the literature. For that purpose, Fuzzy ANP, QFD and Pareto Diagram are combined in the model and the solution is found with Linear Programming.
引用
收藏
页码:365 / 380
页数:16
相关论文
共 50 条
  • [21] A dynamic model for strategic supplier selection
    Sucky, Eric
    OPERATIONS RESEARCH PROCEEDINGS 2004, 2005, : 118 - 126
  • [22] The Decision-Making Model for Aviation Project's Supplier Selection Based on Improved TOPSIS
    Zhao, Meng
    Ren, Rong-rong
    PROCEEDINGS OF 2ND CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE (LISS 2012), VOLS 1 AND 2, 2013,
  • [23] Portfolios of buyer-supplier relationships
    Bensaou, M
    SLOAN MANAGEMENT REVIEW, 1999, 40 (04): : 35 - +
  • [24] Configuring and managing strategic supplier portfolios
    Wagner, SM
    Johnson, JL
    INDUSTRIAL MARKETING MANAGEMENT, 2004, 33 (08) : 717 - 730
  • [25] An Improved Approach for Supplier Selection in Project Material Bidding Procurement
    Xu Maozeng
    Chen Qiaoyu
    Cui Ligang
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 330 - 335
  • [26] Identification of Multi-Criteria for Supplier Selection in IT Project Outsourcing
    Fusiripong, Prashaya
    Baharom, Fauziah
    Yusof, Yuhanis
    2ND INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY 2017 (ICAST'17), 2017, 1891
  • [27] An integrated model for evaluation and optimisation of business project portfolios
    Cannarozzo Tinoco, Maria Auxiliadora
    Dutra, Camila Costa
    Duarte Ribeiro, Jose Luis
    Miorando, Rogerio Feroldi
    ten Caten, Carla Schwengber
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 12 (03) : 442 - 463
  • [28] Optimal project selection and budget allocation for R&D portfolios
    Santiago, LP
    Vakili, P
    Technology Management: A Unifying Discipline for Melting the Boundaries, 2005, : 275 - 281
  • [29] The tradeoffs between portfolios in multi-attribute project portfolio selection
    Zhang, Xiaoxiong
    Dou, Yajie
    Zhao, Qingsong
    Zhao, Kai
    2017 11TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2017, : 366 - 370
  • [30] Sustainable supplier selection model with a trade-off between supplier development and supplier switching
    Devika Aditi
    Jyoti Dhingra Kannan
    P. C. Darbari
    Annals of Operations Research, 2023, 331 : 351 - 392