A SUPPLIER SELECTION MODEL FOR PROJECT PORTFOLIOS

被引:0
|
作者
Tosun, Suleyman [1 ]
Onut, Semih [1 ]
机构
[1] Yildiz Tekn Univ, Makine Fak, Endustri Muhendisligi Bolumu, Istanbul, Turkey
关键词
Project management; weighting projects; supplier selection; fuzzy ANP; QFD and pareto;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, one of the most important subjects for the companies which are profitable and have continuous management principles, is the fact of having targets. The project management discipline which is the most widely used technique to achieve the targets, is continuing its development. The knowledge areas and the processes for that management discipline are detailed in the guide of PMI (Project Management Institute), named as PMBOK (Project Management Body of Knowledge) which is the most popular approach in project management dicipline. Suppliers are appeared as elements which affect the success of projects in the project management knowledge areas. Having the necessary materials on time, on budget and with the quality desired directly affects project success. Consequently, this is a subject that affects the targets indirectly. There are a lot of models and techniques in supplier selection. In that point, we aim to have an upper look to the situation with the model offered. For that reason, the relations of the supplier subjects and the relation between the projects and the targets are in a critical chain. Supplier selection is associated with the targets in the model and it seems the first perspective in the literature with the model introduced. Also, the techniques used in the model are used together for the first time in the literature. For that purpose, Fuzzy ANP, QFD and Pareto Diagram are combined in the model and the solution is found with Linear Programming.
引用
收藏
页码:365 / 380
页数:16
相关论文
共 50 条
  • [1] The research on railway construction project materials supplier selection model
    Li, Ai Min
    Wang, Guo Qing
    Zhang, Jing Jing
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1503 - 1508
  • [2] An Integrated Supplier Selection Model
    Lee, Amy
    Kang, He-Yau
    Lin, Chun Yu
    Wu, Hsin Wei
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON IS MANAGEMENT AND EVALUATION (ICIME 2015), 2015, : 67 - 74
  • [3] Structuring a model for supplier selection
    Borges de Araujo, Maria Creuza
    Alencar, Luciana Hazin
    Viana, Joana Coelho
    MANAGEMENT RESEARCH REVIEW, 2015, 38 (11): : 1213 - 1232
  • [4] Supplier Selection Model Research
    Li, Xiaosong
    Peng, Xinran
    Liu, Tian
    Yuan, Mingxing
    2020 11TH INTERNATIONAL CONFERENCE ON E-EDUCATION, E-BUSINESS, E-MANAGEMENT, AND E-LEARNING (IC4E 2020), 2020, : 328 - 332
  • [5] Strategic Selection and Empowerment of Supplier Portfolios Case: Oil and Gas Industries in Iran
    Sepehri, Mehran
    SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 51 - 60
  • [6] Supplier selection model with contingency planning for supplier failures
    Ruiz-Torres, Alex J.
    Mahmoodi, Farzad
    Zeng, Amy Z.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (02) : 374 - 382
  • [7] Rough MCDM model for green supplier selection in Iran: a case of university construction project
    Shojaei, Payam
    Bolvardizadeh, Ana
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 437 - 452
  • [8] A Supplier Selection Model Emphasizing the Project Risk Management in Drug Production in Pharmaceutical Industry
    Sabbaghi, Malek Mohammad
    Allahyari, Ahmad
    TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2020, 14 (02): : 111 - 120
  • [9] Managing innovation portfolios: From project selection to portfolio design
    Si, Haijian
    Kavadias, Stylianos
    Loch, Christoph
    PRODUCTION AND OPERATIONS MANAGEMENT, 2022, 31 (12) : 4572 - 4588
  • [10] Multiphase supplier selection model based on supplier development orientation
    Chen Xu
    Li Xiang-yang
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (14TH) VOLS 1-3, 2007, : 826 - 831