Nursing inter-shift handover process in mental health settings: a best practice implementation project

被引:16
|
作者
Poh, Chee Lien [1 ]
Parasuram, Rajni [1 ]
Kannusamy, Premarani [1 ]
机构
[1] Inst Mental Hlth, Singapore, Singapore
来源
关键词
best practice; communication; mental health; nursing inter-shift handover; shift handover;
D O I
10.1111/j.1744-1609.2012.00293.x
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Aims Nursing inter-shift handover remains an important traditional ritual in nursing. Timely and effective handover of critical information ensure continuity of patient care and safe delivery. This project took place in a tertiary mental health institution in Singapore. The project aims to (i) examine existing handover practices/process in the tertiary mental health institution; (ii) determine the strengths and limitations of the existing handover practice/process; and (iii) identify, implement and evaluate an evidence-based nursing inter-shift handover process to enhance patient safety and service delivery. Methods This project was conducted in three phases using the Joanna Briggs Institute Practical Application of Clinical Evidence System and Getting Research Into Practice programmes. It was implemented over a period of 4 months from end of August 2011 to beginning of December 2011. Evidence-based strategies such as town hall meetings and education sessions that reinforce proper handover techniques and its importance were implemented to enhance the handover processes and practices in four acute admitting wards. Pre- and post-audit data were observed and recorded for each case handover during each inter-shift handover session in four acute admitting wards. Results The handover processes for 212 cases for four acute admitting wards were observed using the seven audit criteria. Post-implementation audit findings show that compliance rate had improved significantly for the four criteria: an improvement of 49% compliance rate in the use of standardised documentation during shift handover session; an increase of 74% compliance rate in proper identification of patient at the start of each case report; a 31% increase in proper handing over of significant patient's history; and 18% increased compliance in providing detailed observation of patients. Conclusion This project had shown that handover sessions can be made effective by translating evidence into practice through ongoing evidence-based audit. Continuous evidence-based evaluation, identification and implementation of nursing inter-shift handover process are imperative to enhance patient safety and service delivery.
引用
收藏
页码:26 / 32
页数:7
相关论文
共 50 条
  • [21] Health care providers' communication with pediatric patients and carers: a best practice implementation project
    Shoaran, Maryam
    Hajebrahimi, Sakineh
    Kabiri, Neda
    Pourmehr, Hanieh Salehi
    Talebpour, Amin
    JBI EVIDENCE IMPLEMENTATION, 2025, 23 (01): : 24 - 32
  • [22] The prevention of hospital-acquired pressure injuries among adult immobilized patients in a mental health department: a best practice implementation project
    Dobre, Claudia E.
    Gagiu, Corina
    Jitianu, Dorinela A.
    Zazu, Mariana
    Mazilu, Doina C.
    Jimenez, Marina Gallego
    JBI EVIDENCE IMPLEMENTATION, 2023, 21 (01): : 36 - 45
  • [23] Nursing documentation for chemotherapy in a university hospital's bone marrow transplant unit: a best practice implementation project
    dos Santos, Kelli Borges
    Campos, Caroline S.
    Perrone, Ana Carolina Amaral de Sao Jose
    Vieira, Camila M. de Araujo Silva
    Coelho, Davi Pereira
    Hallack-Neto, Abrahao Elias
    Lockwood, Craig
    Puschel, Vilanice Alves de Araujo
    INTERNATIONAL JOURNAL OF EVIDENCE-BASED HEALTHCARE, 2020, 18 (01) : 75 - 85
  • [24] Nursing staff communication with pediatric patients and families in a pediatric transitional care unit: a best practice implementation project
    Sandridge, Shanda
    Palokas, Michelle
    Odom, Anna
    JBI EVIDENCE IMPLEMENTATION, 2023, 21 (02): : 120 - 127
  • [25] Implementation of a Mental Health Objective Structured Clinical Examination (OSCE) Using Standards of Best Practice
    Stockmann, Cherrill
    Adelman-Mullally, Theresa
    Willett, Joanna
    Dyck, Mary J.
    NURSING EDUCATION PERSPECTIVES, 2024, 45 (05) : 313 - 315
  • [26] Quality Improvement Project: Improving the Handover Process Between Junior Doctors at the Hammersmith and Fulham Mental Health Unit
    Ramanathan, Rathy
    Khan, Fariah
    Arakkal, Darshana
    BJPSYCH OPEN, 2023, 9 : S107 - S107
  • [27] Quality Improvement Project: Improving the Handover Process Between Junior Doctors at the Hammersmith and Fulham Mental Health Unit
    Ramanathan, Rathy
    Khan, Fariah
    Arakkal, Darshana
    BJPSYCH OPEN, 2023, 9 : S107 - S107
  • [28] Establishing midwife-led continuity of care interventions in perinatal mental health in high-risk pregnancies: a best practice implementation project
    Morlans-Lanau, Miriam
    Gonzalez-Vives, Maria L.
    Rodriguez-Quiroga, Alberto
    Casbas, Mayte M.
    Klugarova, Jitka
    Klugar, Miloslav
    JBI EVIDENCE IMPLEMENTATION, 2022, 20 : S49 - S58
  • [29] Evidence-Based Practice Implementation in Community Mental Health Settings: The Relative Importance of Key Domains of Implementation Activity
    William C. Torrey
    Gary R. Bond
    Gregory J. McHugo
    Karin Swain
    Administration and Policy in Mental Health and Mental Health Services Research, 2012, 39 : 353 - 364
  • [30] Evidence-Based Practice Implementation in Community Mental Health Settings: The Relative Importance of Key Domains of Implementation Activity
    Torrey, William C.
    Bond, Gary R.
    McHugo, Gregory J.
    Swain, Karin
    ADMINISTRATION AND POLICY IN MENTAL HEALTH AND MENTAL HEALTH SERVICES RESEARCH, 2012, 39 (05) : 353 - 364