Production and work force assignment problem: A bi-level programming approach

被引:3
|
作者
Zhou, Xiaoyang [1 ]
Tu, Yan [2 ,3 ]
Lev, Benjamin [3 ]
机构
[1] Shaanxi Normal Univ, Int Business Sch, Xian 710062, Peoples R China
[2] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Sichuan, Peoples R China
[3] Drexel Univ, LeBow Coll Business, Dept Decis Sci, Philadelphia, PA 19104 USA
基金
中国国家自然科学基金;
关键词
linear bi-level programming; random fuzzy variable; expected objective; expected constraints; interactive programming technique;
D O I
10.1080/17509653.2014.950713
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A home supplies manufacturer manufactures many products and each requires workers with different skills. The manufacturer invites a contracting company to supply workers with different skills for each phase of the production process. The problem becomes a production and work force assignment problem, which can be considered as a bi-level programming problem. The supplier, as the upper decision maker, aims to achieve the objective of maximizing gross revenue by making decisions concerning production levels. The contracting company, as the lower-level decision maker, regards the target to be maximizing profit by making decisions concerning the number of assigned workers. There are uncertainties during the production process and therefore the problem has random fuzzy coefficients. To deal with the uncertainties, a general linear bi-level model with random fuzzy variables is introduced and several properties and crisp equivalents are proposed. Then an interactive programming method is applied to deal with the derived expected bi-level programming problem; after several iterations, the interactive solutions converge to the optimal one. Lastly, a numerical example is also presented to demonstrate the proposed optimization methods.
引用
收藏
页码:50 / 61
页数:12
相关论文
共 50 条
  • [41] Bi-level programming model and KKT penalty function solution approach for reliable hub location problem
    Korani, Ehsan
    Eydi, Alireza
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 184
  • [42] A fuzzy bi-level programming approach to scarce drugs supply and ration planning problem under risk
    Aghababaei, Bahareh
    Pishvaee, Mir Saman
    Barzinpour, Farnaz
    [J]. FUZZY SETS AND SYSTEMS, 2022, 434 : 48 - 72
  • [43] A fuzzy bi-level programming approach to scarce drugs supply and ration planning problem under risk
    Aghababaei, Bahareh
    Pishvaee, Mir Saman
    Barzinpour, Farnaz
    [J]. Fuzzy Sets and Systems, 2022, 434 : 48 - 72
  • [44] Chance constrained bi-level programming approach for flow interception problem with stochastic users in fuzzy environment
    Yang, Jun
    Zhang, Min
    [J]. FOURTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 3, PROCEEDINGS, 2007, : 533 - +
  • [45] Research on bi-level dynamic traffic assignment
    Wan, XJ
    Lu, HP
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 1523 - 1528
  • [46] A Bi-level Programming Approach for Pre-positioning Emergency Warehouses
    Saghehei, E.
    Memariani, A.
    Bozorgi-Amiri, A.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (01): : 128 - 139
  • [47] A bi-level programming approach for global investment strategies with financial intermediation
    Benita, Francisco
    Lopez-Ramos, Francisco
    Nasini, Stefano
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 274 (01) : 375 - 390
  • [48] Ordinary Kriging approach for spatial interpolation based on bi-level programming
    Research Center of Dongting Lake, Hunan Hydro/Power Design Institute, Changsha
    410007, China
    [J]. Xitong Gongcheng Lilum yu Shijian, 2020, 5 (1317-1325): : 1317 - 1325
  • [49] Interactive fuzzy programming for a decentralized two-level transportation planning and work force assignment problem
    Sakawa, M
    Nishizaki, I
    Uemura, Y
    [J]. JOINT 9TH IFSA WORLD CONGRESS AND 20TH NAFIPS INTERNATIONAL CONFERENCE, PROCEEDINGS, VOLS. 1-5, 2001, : 215 - 220
  • [50] A Bi-level programming approach for pre-positioning emergency warehouses
    Saghehei, E.
    Memariani, A.
    Bozorgi-Amiri, A.
    [J]. Memariani, A. (memariani@khu.ac.ir), 1600, Materials and Energy Research Center (34): : 128 - 139