Integrated Scheduling of a Two Stage Supply Chain Network using Simulation - A Case Study

被引:0
|
作者
Subramanya, K. N. [1 ]
Sharma, S. C. [2 ]
机构
[1] RV Coll Engn, Dept Ind Engn & Management, Bangalore 560059, Karnataka, India
[2] RV Coll Engn, Bangalore 560059, Karnataka, India
关键词
Two Stage Supply Chain Network; Simulation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper is the result of the work carried out to study the performance analysis of two stage supply chain network using simulation. The objective of study is to model an integrated system for a two stage supply chain network of an automobile company and measuring the performance parameters and establishing the priority decision and queuing rules for improving the utilization of resources. The study is restricted to measuring operational processes in a two stage supply chain between the supplier - manufacturer - distributors. The qualitative data collected has been used to understand the various processes in the supply chain at the stage of component manufacturing and sub-assembly at suppliers, assembly in the final line at the manufacturer plant and the logistics involving the supplier and manufacturer on one hand and the manufacturer and distributor on the other. The data collected have been modeled using the simulation package PROMODEL, using manufacturing oriented modeling elements and rule based decision logic. The data obtained as output from the suppliers has been fed as input arrival data into the manufacturer model to facilitate integration. Rule based decision logics have been applied to the models developed and its behavior on the application of various PDR (Priority Decision Rule) has been documented. Performance measures have been obtained for various scheduling logics.
引用
收藏
页码:364 / 369
页数:6
相关论文
共 50 条
  • [1] Performance Analysis of a Two Stage Supply Chain Network Using Simulation - A Case Study
    Ramaa, A.
    Rangaswamy, T. M.
    Subramanya, K. N.
    [J]. WORLD CONGRESS ON ENGINEERING, WCE 2010, VOL III, 2010, : 2401 - 2406
  • [2] Simulation model of a vertically integrated supply chain: A case study
    Byrne, P. J.
    Heavey, Cathal
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2006, 13 (02): : 126 - 135
  • [3] A novel two-stage stochastic programming model to design an integrated disaster relief supply chain network-a case study
    Fazli, Leyla
    [J]. OPERATIONS MANAGEMENT RESEARCH, 2024,
  • [4] A two-stage stochastic supply chain scheduling problem with production in cellular manufacturing environment: A case study
    Esmailnezhad, B.
    Saidi-Mehrabad, M.
    [J]. SCIENTIA IRANICA, 2023, 30 (04) : 1399 - 1422
  • [5] Scheduling in a two-stage supply chain with uncertain parameters
    Shen, Jiayu
    Zhu, Yuanguo
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3439 - 3449
  • [6] Two-Stage Supply Chain Scheduling with an Option of Outsourcing in Stage One
    Qi, Xiangtong
    [J]. 2008 5TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2008, : 248 - 253
  • [7] A Unit Cost Adjusting Heuristic Algorithm for the Integrated Planning and Scheduling of a Two-Stage Supply Chain
    Wang Jianhua
    Huang Xianfeng
    Mei Qiang
    Tian Gang
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (05): : 1433 - 1446
  • [8] Simulation of Supply Chain with Disturbances Using Flexsim - Case Study
    Hoffa, Patycja
    Pawlewski, Pawel
    [J]. HIGHLIGHTS OF PRACTICAL APPLICATIONS OF AGENTS, MULTI-AGENT SYSTEMS, AND SUSTAINABILITY: THE PAAMS COLLECTION, PAAMS 2015, 2015, 524 : 90 - 101
  • [9] Integrated supply chain network design and superstructure optimization problem: A case study of microalgae biofuel supply chain
    Shirazaki, Setayesh
    Pishvaee, Mir Saman
    Sobati, Mohammad Amin
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2024, 180
  • [10] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343