NEW GHANA GOLD MINE SLATED FOR 1993 PRODUCTION

被引:0
|
作者
不详
机构
来源
E&MJ-ENGINEERING AND MINING JOURNAL | 1992年 / 193卷 / 01期
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:9 / 9
页数:1
相关论文
共 50 条
  • [21] Gold mine faces new hurdle
    不详
    [J]. SCIENCE, 2020, 369 (6507) : 1037 - 1037
  • [23] Boddington gold mine - An example of sustaining gold production for 30 years
    Dunne, R.
    Hart, S.
    Parker, B.
    Veillette, G.
    [J]. WORLD GOLD 2007: BY AND CO-PRODUCTS AND THE ENVIRONMENT, 2007, (09): : 213 - +
  • [24] New tissue PM slated
    Anon
    [J]. Pulp and Paper Project Report, 2000, 20 (05):
  • [25] Electroformed gold from gold mine solutions - A new approach to gold recovery
    Sole, M. J.
    [J]. WORLD GOLD 2007: BY AND CO-PRODUCTS AND THE ENVIRONMENT, 2007, (09): : 277 - 285
  • [26] BACHELOR LAKE GOLD MINE: ON THE ROAD TO PRODUCTION.
    Knoll, Kerry J.
    [J]. Western miner, 1982, 55 (01): : 23 - 24
  • [27] San Juan Ridge gold mine begins production
    [J]. Min Eng (Littleton Colo), 12 (26-31):
  • [28] Mineralogical test and production research of gold mine waste
    Gurman, M. A.
    Shcherbak, L. I.
    Bogomyakov, R. V.
    Vylegzhanina, E. V.
    [J]. JOURNAL OF MINING SCIENCE, 2016, 52 (05) : 974 - 981
  • [29] Mineralogical test and production research of gold mine waste
    M. A. Gurman
    L. I. Shcherbak
    R. V. Bogomyakov
    E. V. Vylegzhanina
    [J]. Journal of Mining Science, 2016, 52 : 974 - 981
  • [30] Canada's Largest Gold Mine Nearing Production
    不详
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2012, 213 (12): : 4 - 4