RESOURCE CONSTRAINTS AND THE QUALITY OF CARE

被引:0
|
作者
MAXWELL, RJ
机构
来源
LANCET | 1985年 / 2卷 / 8461期
关键词
D O I
暂无
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
引用
收藏
页码:936 / 939
页数:4
相关论文
共 50 条
  • [41] Impact of Palliative Care on Resource Utilization and Quality in the Care of Patients Undergoing Therapeutic Hypothermia
    Allen, Jennifer
    Kincaid, Hope
    Rockwell, Elke
    [J]. THERAPEUTIC HYPOTHERMIA AND TEMPERATURE MANAGEMENT, 2020, 10 (01) : 37 - 44
  • [42] The relationship between resource constraints and physician problem solving - Implications for improving the process of care
    LescoeLong, MA
    Long, MJ
    Amidon, RL
    Kronenfeld, JJ
    Glick, DC
    [J]. MEDICAL CARE, 1996, 34 (09) : 931 - 953
  • [43] An Exploratory Study on Optimal Iterative Design Schedules with the Consideration of Design Quality and Resource Constraints
    Leu, Sou-Sen
    Suparman, Theresia Daisy Nattali
    Hung, Cathy Chang-Wei
    [J]. SUSTAINABILITY, 2021, 13 (08)
  • [44] Energy-Efficient Resource Allocation in Wireless Networks with Quality-of-Service Constraints
    Meshkati, Farhad
    Poor, H. Vincent
    Schwartz, Stuart C.
    Balan, Radu V.
    [J]. IEEE TRANSACTIONS ON COMMUNICATIONS, 2009, 57 (11) : 3406 - 3414
  • [45] Fuzzy resource constraints graphplan
    Gu, Wen-Xiang
    Wang, Fang
    Ren, Jia-Yue
    Hou, Gang
    [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 494 - +
  • [46] Aperiodic servers with resource constraints
    Caccamo, M
    Sha, L
    [J]. 22ND IEEE REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2001, : 161 - 170
  • [47] RESEARCH ADVANCES AND RESOURCE CONSTRAINTS
    MCMILLIN, JM
    [J]. NEW ENGLAND JOURNAL OF MEDICINE, 1981, 305 (22): : 1352 - 1352
  • [48] Physicians' responses to resource constraints
    Hurst, SA
    Hull, SC
    DuVal, G
    Danis, M
    [J]. ARCHIVES OF INTERNAL MEDICINE, 2005, 165 (06) : 639 - 644
  • [49] Dynamic contests with resource constraints
    Aner Sela
    Eyal Erez
    [J]. Social Choice and Welfare, 2013, 41 : 863 - 882
  • [50] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS
    DIKE, SH
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1964, 11 (04) : 155 - 157