共 50 条
- [35] New heuristic for scheduling re-entrant production lines [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 199 - +
- [36] A Two-stage Heuristic Method for Vulcanization Production Scheduling [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
- [37] COMPARISON OF TWO HEURISTIC APPROACHES FOR SOLVING THE PRODUCTION SCHEDULING PROBLEM [J]. INFORMATION TECHNOLOGY AND CONTROL, 2011, 40 (02): : 118 - 122
- [38] A heuristic methods for stacker and reclaimer scheduling problem in coal storage area [J]. 2019 INTERNATIONAL COLLOQUIUM ON LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA), 2019,
- [39] SOLVING THE FUZZY PROJECT SCHEDULING PROBLEMS WITH META-HEURISTIC METHODS [J]. SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2010, 28 (02): : 86 - 101
- [40] Heuristic and metaheuristic methods for the parallel unrelated machines scheduling problem: a survey [J]. Artificial Intelligence Review, 2023, 56 : 3181 - 3289