共 50 条
- [41] DEVELOPMENT OF CAMBER CONTROL-SYSTEM IN PLATE ROLLING .2. DEVELOPMENT OF CAMBER-METER AT HEAVY PLATE MILL LINE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1176 - 1176
- [43] DEVELOPMENT OF A PROCESS FOR MANUFACTURING TFP (TRIMMING FREE PLATE) .2. CONTROL-SYSTEM OF TFP EDGER IN PLATE ROLLING [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1117 - 1117
- [45] The study and development of production synchronized scheduling system of minimizing the cost flow on steelmaking-hot rolling [J]. LOW COST AUTOMATION 1998 (LCA'98), 1999, : 169 - 172
- [47] DECISION SUPPORT SYSTEM IN CIM - AN INTEGRATED PRODUCTION ACTIVITY CONTROL-SYSTEM [J]. IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 3 : 475 - 493
- [48] FUNCTIONS AND INTERFACES IN A FLEXIBLE PRODUCTION PLANNING AND CONTROL-SYSTEM [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1991, 4 (01): : 31 - 41
- [49] KEY DESIGN PARAMETERS OF A COMPUTER PRODUCTION CONTROL-SYSTEM [J]. JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1972, 11 (01): : 58 - &
- [50] GUIDELINES FOR NEW CONTROL-SYSTEM FOR PRODUCTION AND TRANSMISSION OF ENEL [J]. ELETTROTECNICA, 1974, 61 (07): : 663 - 664