Instrumentation and Full-Scale Test of a Post-Tensioned Concrete Bridge

被引:0
|
作者
Bagge, Niklas [1 ]
Nilimaa, Jonny [1 ]
Blanksvard, Thomas [1 ]
Elfgren, Lennart [1 ]
机构
[1] Lulea Univ Technol, S-97287 Lulea, Sweden
来源
NORDIC CONCRETE RESEARCH | 2014年 / 51卷 / 03期
关键词
Assessment; bridges; carbon fibre reinforced polymer; concrete; destructive test; ductility; flexure; full-scale test; monitoring; near-surface mounted reinforcement; non-destructive test; prestressed laminates; post-tension; punching; robustness; shear; strengthening; structural behaviour;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To meet new demands, existing bridges might be in need for repair, upgrading or replacement. To assist such efforts a 55-year-old post-tensioned concrete bridge has been comprehensively tested to calibrate methods for assessing bridges more robustly. The programme included strengthening, with two systems based on carbon fibre reinforced polymers (CFRPs), failure loading of the bridge's girders and slab, and determination of post-tension cables' condition and the material behaviour. The complete test programme and related instrumentation are summarised, and some general results are presented. The measurements address several current uncertainties, thereby providing foundations for both assessing existing bridges' condition more accurately and future research.
引用
收藏
页码:63 / 83
页数:21
相关论文
共 50 条
  • [31] SIMPLIFICATION OF POST-TENSIONED CONCRETE ANCHORAGES
    HUGHES, BP
    MIDDLETO.CI
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 2-RESEARCH AND THEORY, 1974, 57 (JUN): : 373 - 378
  • [32] TEST OF SCALE MODEL POST-TENSIONED FLAT-PLATE
    GOLI, HB
    GESUND, H
    [J]. JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1978, 104 (01): : 242 - 244
  • [33] Rehabilitation of post-tensioned concrete bridges
    Flohrer, C
    [J]. REPAIR AND MAINTENANCE OF CONCRETE AND REINFORCED CONCRETE STRUCTURES, 1997, : 163 - 173
  • [34] TEST OF SCALE MODEL POST-TENSIONED FLAT-PLATE
    BURNS, NH
    HEMAKOM, R
    [J]. JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1977, 103 (06): : 1237 - 1255
  • [35] Full-Scale Shaking Table Tests on a Substandard RC Building Repaired and Strengthened with Post-Tensioned Metal Straps
    Garcia, Reyes
    Hajirasouliha, Iman
    Guadagnini, Maurizio
    Helal, Yasser
    Jemaa, Yaser
    Pilakoutas, Kypros
    Mongabure, Philippe
    Chrysostomou, Christis
    Kyriakides, Nicholas
    Ilki, Alper
    Budescu, Mihai
    Taranu, Nicolae
    Ciupala, Mihaela Anca
    Torres, Lluis
    Saiidi, M.
    [J]. JOURNAL OF EARTHQUAKE ENGINEERING, 2014, 18 (02) : 187 - 213
  • [36] On the collapse of a post-tensioned reinforced concrete truss bridge during the construction phases
    Zucca, Marco
    Tattoni, Sergio
    DI Castri, Marta
    Simoncelli, Marco
    [J]. ENGINEERING FAILURE ANALYSIS, 2024, 158
  • [37] Ultrasonic tomography of grouted duct post-tensioned reinforced concrete bridge beams
    Martin, J
    Broughton, KJ
    Giannopolous, A
    Hardy, MSA
    Forde, MC
    [J]. NDT & E INTERNATIONAL, 2001, 34 (02) : 107 - 113
  • [38] Cyclic tests of precast segmental unbonded post-tensioned concrete bridge piers
    Ou, Y. -C.
    Lee, G. C.
    Wang, P. -H.
    Tsai, M. -S.
    Chang, K. -C.
    [J]. INNOVATIONS IN BRIDGE ENGINEERING TECHNOLOGY, 2007, : 27 - 33
  • [39] Structural Assessment of a Post-Tensioned Box Girder Bridge affected by Concrete Creep
    Sconocchia, Giuseppe Galassi
    Mariani, Francesco
    Meoni, Andrea
    Ierimonti, Laura
    Venanzi, Ilaria
    Ubertini, Filippo
    [J]. EUROPEAN ASSOCIATION ON QUALITY CONTROL OF BRIDGES AND STRUCTURES, EUROSTRUCT 2023, VOL 6, ISS 5, 2023, : 969 - 974
  • [40] Impact of construction errors on the structural safety of a post-tensioned reinforced concrete bridge
    Galvao, Neryvaldo
    Matos, Jose C.
    Hajdin, Rade
    Ferreira, Luis
    Stewart, Mark G.
    [J]. ENGINEERING STRUCTURES, 2022, 267